Machine Studies
Draft Schedule for Run01-12 2025
April 14 0800 – April 15 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, April 14, 2025 |
|
|
0800-0830 |
Test gaps lower limits |
Wei |
No Beam |
0800-0900 |
Adjust PAR RF attenuation |
Berenc |
No Injection |
0815-0900 |
Test AGG scripts |
E. Chandler |
No Beam |
0800-0900 |
FOFB attenuation verification |
Kishbaugh |
No Beam |
|
|
|
|
1000-1300 |
RG2 hysteresis data + recovery |
Shang |
No Beam |
1000-1100 |
EIX degaussing |
Berkland |
No Beam |
1300-1600 |
RG1 study |
Sun |
No Beam |
1600-2000 |
PAR RF12 |
Mohsen |
Limited injection |
|
|
|
|
2000-2200 |
Apply low coupling correction for a reference lattice |
Emery |
Stored Beam and Injection |
2200-2400 |
Operator training |
Ops |
Stored Beam and Injection |
|
Tuesday April 15, 2025 |
|
|
0000-0200 |
Verify 48 bunch operation |
Emery |
Stored Beam and Injection |
0200-0600 |
ID perturbation measurement |
Emery |
Stored Beam and Injection |
0600-0800 |
Recover SR systems/prepare for user beam |
Ops |
Stored Beam and Injection |