Draft Schedule for Run01-12 2025

April 14 0800 – April 15 0800



Time

Descriptions

Studiers

SR Status


Monday, April 14, 2025



0800-0830

Test gaps lower limits

Wei

No Beam

0800-0900

Adjust PAR RF attenuation

Berenc

No Injection

0815-0900

Test AGG scripts

E. Chandler

No Beam

0800-0900

FOFB attenuation verification

Kishbaugh

No Beam





1000-1300

RG2 hysteresis data + recovery

Shang

No Beam

1000-1100

EIX degaussing

Berkland

No Beam

1300-1600

RG1 study

Sun

No Beam

1600-2000

PAR RF12

Mohsen

Limited injection

4 h

Booster extraction studies to BTX

Calvey Dooling

Stored Beam and Injection

2000-2200

Apply low coupling correction for a reference lattice

Emery

Stored Beam and Injection

2200-2400

Operator training

Ops

Stored Beam and Injection


Tuesday April 15, 2025



0000-0200

Verify 48 bunch operation

Emery

Stored Beam and Injection

0200-0600

ID perturbation measurement

Emery

Stored Beam and Injection

0600-0800

Recover SR systems/prepare for user beam

Ops

Stored Beam and Injection