Machine Studies
Draft Schedule for Run01-13 2025
April 21 0800 – April 22 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, April 21, 2025 |
|
|
0800-0900 |
IEX studies (need beam) |
Berkland/Smith |
Stored Beam & Injection |
0900-1000 |
Reboot LB+ and K5 LLRF iocs |
Grass |
No Beam or Injection |
0900-1100 |
S30BM RM investigation |
Nguyen |
No Beam |
0900-1100 |
S08 PS noise investigation |
Puttkammer |
No Beam |
0900-1200 |
“Minimally invasive” IETS work |
Fors |
No Beam |
0930-1030 |
Update DCCT |
Paskvan |
No Beam RF off |
0930 |
Fire Drill for bldg 400 (10 minutes) |
All |
No beam |
1000-1300 |
RG2 tune up (i.e. gun beam only) |
Sun |
Stored Beam and Injection |
1000-1200 |
28ID GRID X BPM air work |
Clute |
Access Zone D |
1030-1200 |
Assess S35ID shutter |
MOM-VAC |
Access Zone F |
1000-1200 |
PAR Harmonic Digital LLRF work |
Berenc |
Limited Injection |
1200-1400 |
Recover SR and Injectors |
Ops |
Limited Injection |
|
|
|
|
1300-1700 |
Booster extraction to BTX |
Calvey, HP |
No injection |
1700-1900 |
RF12 high voltage |
Mohsen |
Limited Injection |
1900-2300 |
130 mA studies with gaps at safety limits |
Borland, LI |
Stored Beam and Injection |
2300-2400 |
BCM nonlinearity for single bunch |
Weixing Borland |
Stored Beam and Injection |
|
Tuesday April 22, 2025 |
|
|
0000-0200 |
Synchrotron frequency spectrum for single bunch |
Weixing |
Stored Beam and Injection |
0200-0400 |
Operator training |
Ops |
Limited injection |
0400-0600 |
Setup 48 bunches, check optics, recover steering |
Emery |
Stored Beam and Injection |
0600-0800 |
Recover SR systems/prepare for user beam |
Ops |
Stored Beam and Injection |