Machine Studies

Draft Schedule for Run01-13 2025

April 21 0800 – April 22 0800



Time

Descriptions

Studiers

SR Status


Monday, April 21, 2025



0800-0900

IEX studies (need beam)

Berkland/Smith

Stored Beam & Injection

0900-1000

Reboot LB+ and K5 LLRF iocs

Grass

No Beam or Injection

0900-1100

S30BM RM investigation

Nguyen

No Beam

0900-1100

S08 PS noise investigation

Puttkammer

No Beam

0900-1200

Minimally invasive” IETS work

Fors

No Beam

0930-1030

Update DCCT

Paskvan

No Beam RF off

0930

Fire Drill for bldg 400 (10 minutes)

All

No beam

1000-1300

RG2 tune up (i.e. gun beam only)

Sun

Stored Beam and Injection

1000-1200

28ID GRID X BPM air work

Clute

Access Zone D

1030-1200

Assess S35ID shutter

MOM-VAC

Access Zone F

1000-1200

PAR Harmonic Digital LLRF work

Berenc

Limited Injection

1200-1400

Recover SR and Injectors

Ops

Limited Injection





1300-1700

Booster extraction to BTX

Calvey, HP

No injection

1700-1900

RF12 high voltage

Mohsen

Limited Injection

1900-2300

130 mA studies with gaps at safety limits

Borland, LI

Stored Beam and Injection

2300-2400

BCM nonlinearity for single bunch

Weixing Borland

Stored Beam and Injection


Tuesday April 22, 2025



0000-0200

Synchrotron frequency spectrum for single bunch

Weixing

Stored Beam and Injection

0200-0400

Operator training

Ops

Limited injection

0400-0600

Setup 48 bunches, check optics, recover steering

Emery

Stored Beam and Injection

0600-0800

Recover SR systems/prepare for user beam

Ops

Stored Beam and Injection