Machine Studies

Draft Schedule for Run01-2, 2025

February 3 0800 – February 4 0800



Time

Descriptions

Studiers

SR Status


Monday, February 3, 2025



0800-0900

Test remote reset of BESOCM

Keane

No Injection

0800-1000

Check K4 VSWR levels

Yang

No Injection

0800-1000

Reboot PSAGG soft iocs

Shoaf

No Beam

0800-1000

Test PS aggregator rest script

E. Chandler

No Beam

0800-1000

Update IETS firmware and Reboot sioc2accumloss

Fors

No Beam/No Injection

0800-1000

Replace B3C5V GESPAC

Puttkammer

No Injection

0800-1000

Unstick quadrupoles

Kreps

No Beam

0830-1030

Evaluate IDVC location in S08

Wei

Access Zone A

1000-1200

(06-18) Injector training

Ops

Limited Injection

1200-1400

SR stored beam checkout, response matrix measurement

Emery

Stored beam & injection

1400-1800

Bunch length measurement from button BPM signal. Single bunch

Cheng

Stored Beam & Injection

1400-1800

PAR Harmonic high voltage study. Parallel with above

Mohsen, Calvey

Stored Beam & Injection

1800-2200

Continue to condition with beam to 200 mA with ID gaps closed

Emery Berenc

Stored beam & injection

3 hours

(18-06) Injector training

Ops

Limited Injection

2200-0200

Orbit feedback studies to simulate local FOFB with MOFB

Carwardine, Kallakuri

Stored Beam & Injection


Tuesday February 4, 2025



0200-0600

FOK y-displacement measurement in pinger mode

Dooling

Stored Beam & Injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection