Machine Studies
Draft Schedule for Run01-3, 2025
February 10 0800 – February 11 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 10, 2025 |
|
|
0800-0900 |
Practice SR injection |
Berkland/Ops |
Stored Beam and Injection |
0900-1000 |
Reboot iocinjtime/Update IETS |
Fors/Hong |
No Beam/No Injection |
1000-1200 |
Adjust timing and condition K4 |
Meyer |
Limited Injection |
1100-1200 |
RF waveguide switch |
RF Group |
Limited Injection |
1100-1200 |
Recover SR systems |
Ops |
Stored Beam and Injection |
1200-1600 |
SR 200 mA study |
Berenc |
Stored Beam and Injection |
1600-1800 |
Injector training (08-18) |
Ops |
Limited Injection |
1800-2200 |
PAR high charge/ RF 12 high voltage study |
Mohsen/Calvey |
Limited Injection |
2200-0200 |
FOFB/MOFB vertical plane |
Carwardine/Kallakuri |
Stored Beam and Injection |
|
Tuesday February 11, 2025 |
|
|
0200-0040 |
Injector training (18-06) |
Ops |
Limited Injection |
0400-0600 |
SR injection efficiency optimization |
Emery |
Stored Beam and Injection |
0600-0800 |
Linac console test/ prepare for user beam |
Fystro/Urban/Ops |
Stored beam & injection |
|
|
|
|