Draft Schedule for Run01-6 2025
March 3 0800 – March 4 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 3, 2025 |
|
|
0800-1230 |
RG1 study |
Yin-e |
K5 off/ No Injection |
0800-1100 |
LLRF cable making at K5 |
Yawei |
K5 off/ No Injection |
0900-1000 |
Enable S40 HCOLL motor |
Grass |
No Beam |
0900-1000 |
Undo MPS changes |
Smith |
No Beam |
0900-1100 |
Investigate BTS:AB trips |
Kreps/Jordan |
Limited Injection |
0900-1100 |
Unstick SR sector 40 Cab1 PS4 (S40A:S1) |
Vargas |
No Beam |
0900-1100 |
Investigate B3C5V (CPS OT) |
Puttkammer |
Limited Injection |
0900-1100 |
Troubleshoot BLS dewar level problem |
Furst/McDonald |
No Beam |
1000-1100 |
Measure MPS RF mute FOK delay |
Dooling |
No Beam |
|
|
|
|
1230-1600 |
FOFB (fill to 200 mA) |
Carwardine Kallakuri |
Limited injection |
1300-1700 |
PAR RF12 high voltage |
Mohsen Calvey |
Limited injection |
1700-1800 |
Injector training (08-18) |
Ops |
Limited Injection |
1800-2000 |
Booster high charge |
Calvey Mohsen |
Limited injection |
2000-2100 |
RF noise suppression effectiveness data at I < 200 mA |
Berenc Emery |
Stored Beam and Injection |
2100-2300 |
FOPK y-displacement (I < 10 mA) |
Dooling |
Stored Beam and Injection |
2300-2400 |
Injector training (18-06) |
Ops |
Limited Injection |
|
Tuesday March 4, 2025 |
|
|
0000-0400 |
Corrected SR lattice for first set of new sextupoles Borland provided |
Emery |
Stored Beam and Injection |
0400-0600 |
Look at instability of injected bunch at 200 mA |
Emery |
Stored Beam and Injection |
0600-0800 |
Recover SR systems/prepare for user beam |
Ops |
Stored Beam and Injection |