Machine Studies

Draft Schedule for Run01-7 2025

March 10 0800 – March 11 0800



Time

Descriptions

Studiers

SR Status


Monday, March 10, 2025



0800-0900

Test injection script/SR training

Berkland

Stored Beam and Injection

0900-1000

Collect IS1 measurement

Abid

No Beam

0930-1000

Download Linac RF PLC code

Hong

No Injection

0930-1030

Digital camera/screen update

Grass

Limited Injection

0930-1030

Update firmware for FOFB

Kreps

No Beam

0930-1130

Troubleshoot B3C5V

Vargas

Limited injection

0930-1130

Reroute FOK discharge/MPS reset

Smith

No Beam/No RF

0930-1230

Verify cabling in 31ID stations

Boron

No Beam

0930-1300

Update SR IOCS (S:IS first)

B. Chandler

No Beam

1000-1100

Investigate L1:P1

Brill

Access Linac

1000-1300

Troubleshoot PAR RF/ACIS interface

SI/Smith

Access Linac

1000-1300

Cable removal Laser chiller inspection

Erwin

Access ITS

1000-1300

Replace leaking flag actuator/Verify LTP:FS3 flag configuration

Kisbaugh

Access Linac

1030-1300

FODO vibration measurements

Preissner

Access Zone A

1030-1300

Investigate 7BM PS-2

McNamara/Clute

Access Zone A

1130-1230

IETS measurement

Hong/Fors

No Beam

1300-1500

Recover SR and injector systems

Ops

Limited Injection





1500-1800

Booster extraction studies with some SR test injection of single bunch

Calvey, Mohsen, Berenc

Limited Injection

1600-1800

Spark BPM signal investigation (one bunch)

Cheng

Stored Beam and Limite Injection

1800-2000

BTS:CP1 button C signal check

Cheng

Stored Beam and Injection

1800-2100

Lifetime studies plus bunch length measurement

Borland, Cheng

Stored Beam and Injection

2100-0100

RG1 study

Sun

Limited Injection


Tuesday March 11, 2025



0100-0400

Try new sextupoles for operations

Emery

Stored Beam and Injection

0400-0600

Operator training

Ops

Stored Beam and Injection

0600-0800

Recover SR systems/prepare for user beam

Ops

Stored Beam and Injection