Machine Studies
Draft Schedule for Run01-9 2025
March 24 0800 – March 25 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 24, 2025 |
|
|
0800-1100 |
Booster console testing |
Fystro/Sas-Pawlik |
Limited Injection |
0830-1030 |
Verify wiring at 31ID |
Boron |
No Beam |
0830-1030 |
Upgrade S38:39 PLC firmware |
Ruan |
No Beam |
0830-1030 |
Reboot sioc2btc |
Fors |
No Beam |
0900-1000 |
Assess Sector 8 for installation |
Wei |
Access Zone A |
0900-1300 |
6ID vacuum investigation |
Clute |
Access Zone A |
0930-1130 |
Verify shutters and FEEPS at 28ID |
McNamara |
Access Zone D |
1000-1100 |
ALD tour |
Sajaev/Chapon |
Access Zone A |
1100-1300 |
Fix BTS:BB CT |
Jordan |
No Injection |
1100-1300 |
linac rf waveguide switching test |
Sun |
No Injection |
1100-1300 |
Linac RF reboot and then conditioning for eventual 450 MeV |
Meyer |
No Injection 11-12 Limited Injection after |
1330-1630 |
Recover SR and Injectors |
Ops |
Limited Injection |
|
|
|
|
1500-1900 |
PAR RF12 high voltage |
Mohsen |
Limited Injection |
1900-2100 |
test the SR injection efficiency optimizer |
Shang Emery |
Stored Beam and Injection |
2100-2200 |
Adjust Booster extraction energy by +2e-3 relative |
Emery Fors |
Stored Beam and Injection |
2200-2400 |
horizontal DA using an injection kicker |
Borland |
Stored Beam and Injection |
|
|
|
|
|
Tuesday March 25, 2025 |
|
|
0000-0400 |
LFB studies, grow/damp and HOM measurements |
Kallakuri |
Stored Beam and Injection |
0400-0600 |
Setup 48 bunches |
Emery |
Stored Beam and Injection |
0600-0800 |
Recover SR systems/prepare for user beam |
Ops |
Stored Beam and Injection |