Machine Studies

Draft Schedule for Run02-2, 2025

June 9 0800 – June 10 0800



Time

Descriptions

Studiers

SR Status


Monday, June 9, 2025



0800-1000

Up-size fan fuse BTS Corrector PS

Jordan

No injection

0800-1000

Update FOFB tier 3 switch

Carwardine/IT

No Beam

0800-1200

Replace P1K Sola transformer

Puttkammer

No Injection

0900-1100

33BM End to end test

McNamara

No Beam. A-E in CA

0900-1100

Replace thyratron temp sensor

PS Group

Access PAR

0900-1100

Replace leaking actuator

Kisbaugh

Access Linac

0930-1000

PAR door measurements

Moore

Access PAR

1100-1230

Set up SR magnets

Ops


1200-1500

PAR diagnostic checking

Mohsen

Limited injection

1230-1330

Correct SR tune, 10 mA

Emery

Stored beam & Limited Injection

1330-1600

Beamline thermal study 10 mA, no swap-out, triple stop closed.

Emery, Narayanan

Stored beam & Limited Injection

1600-1800

Operator training (08-18)

Ops

Limited injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-2400

Troubleshoot high 60-Hz harmonics noise at higher RF power.

Emery Berenc Borland

Stored beam & injection


Tuesday June 10, 2025



0000-0400

ID corrector feedforward table

Emery

Stored beam & injection

0400-0600



Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection