Machine Studies
Draft Schedule for Run02-2, 2025
June 9 0800 – June 10 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 9, 2025 |
|
|
0800-1000 |
Up-size fan fuse BTS Corrector PS |
Jordan |
No injection |
0800-1000 |
Update FOFB tier 3 switch |
Carwardine/IT |
No Beam |
0800-1200 |
Replace P1K Sola transformer |
Puttkammer |
No Injection |
0900-1100 |
33BM End to end test |
McNamara |
No Beam. A-E in CA |
0900-1100 |
Replace thyratron temp sensor |
PS Group |
Access PAR |
0900-1100 |
Replace leaking actuator |
Kisbaugh |
Access Linac |
0930-1000 |
PAR door measurements |
Moore |
Access PAR |
1100-1230 |
Set up SR magnets |
Ops |
|
1200-1500 |
PAR diagnostic checking |
Mohsen |
Limited injection |
1230-1330 |
Correct SR tune, 10 mA |
Emery |
Stored beam & Limited Injection |
1330-1600 |
Beamline thermal study 10 mA, no swap-out, triple stop closed. |
Emery, Narayanan |
Stored beam & Limited Injection |
1600-1800 |
Operator training (08-18) |
Ops |
Limited injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-2400 |
Troubleshoot high 60-Hz harmonics noise at higher RF power. |
Emery Berenc Borland |
Stored beam & injection |
|
Tuesday June 10, 2025 |
|
|
0000-0400 |
ID corrector feedforward table |
Emery |
Stored beam & injection |
0400-0600 |
|
|
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |