Machine Studies

Draft Schedule for Run02-3, 2025

June 16 0800 – June 18 0800



Time

Descriptions

Studiers

SR Status


Monday, June 16, 2025



0800-1000

PAR console testing

Fystro/Urban

Limited Injection

0830-1130

Update FOFB bipolar firmware/change unipolar IP addresses

Kreps

No Beam

0800-1000

Update TBT IOCs

E. Chandler

No Beam

0900-1100

Replace the DOSFET sensor in S01

Wei

Access Zone A

1000-1300

Change Linac reference timing

Hong

Linac RF down

1000-1300

BTS corrector fuse upgrade

Jordan

No Injection

1000-1300

Replace PAR kicker control power

Puttkammer

No Injection

1000-1200

Adjust PAR RF-12 drive

Smith

No Injection

1100-1300

SR magnet conditioning

Ops

No Beam

1100-1400

Test SR kicker firmware

Paskvan

No beam





1300-1700

450 MeV linac setup and perhaps PAR/booster

Yine, Mohsen

Limited Injection

1700-1800

SR beam check and test 10 bpm per sector MOFB (can spill over to next time slot)

Emery

Stored beam & injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-0200

Low-beta x/y lattice commissioning (conditioning could occur in previous time slot)

Borland Emery

Stored beam & injection


Tuesday June 17, 2025



0200-0600




0600-0800

Injector training (06-18)

Ops

Limited Injection

0800-1100

Booster console testing

Fystro/Sas-Pawlik

Limited Injection

1100-1400

Test the linac charge optimization with degauss

Shang

Limited Injection

1400-1600

TCAV Longitudinal Phase-Space Measurements

Wootton Suzuki

Limited Injection

1600-2000

Timing scans with single bunch; Grow/damp measurements

Kallakuri

Stored beam & injection

2000-2200

Injector training (18-06)

Ops

Limited Injection

2200-0000





Wednesday June 18, 2025



0000-0400




0400-0600

Set up SR for operations

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection