Draft Schedule for Run02-4, 2025
June 23 0800 – June 24 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 23, 2025 |
|
|
0800-0815 |
Test align P0 medm screen |
Berkland |
Stored Beam and Injection |
0815 |
Reboot siocrunctrl2 for new run control PVs |
OPS |
No Beam |
0830-1030 |
Update Zone B PLC software |
Ruan |
No Beam |
0830-1030 |
Update PS IP addresses |
Kreps |
No Beam SR PS at zero |
0830-1030 |
Investigate P1K thyratron |
Puttkammer |
Access PAR |
0830-1030 |
Replace leaking flag actuator |
Kisbaugh |
Access Linac |
0830-1030 |
ITS flag alignment + laser status panel |
Erwin, SI group |
Access ITS |
0900-1000 |
Check labeling on |
Weghorn |
Access Zone F |
0900-1100 |
Check FLIR camera |
DIAG |
Access Zone F |
|
|
|
|
1100-1230 |
Recover SR magnets |
OPS |
No Stored beam & No injection |
1200-1400 |
PAR RF12 drive attenuation adjustment |
Mohsen, RF group |
No Stored beam & No injection |
1400-1700 |
PAR RF12 high charge |
Mohsen, Berenc |
No Stored beam & No injection |
1200-1500 |
Update IES IOC |
Paskvan |
No Stored beam & No injection |
1700-1800 |
Operator training (08-18). One hour only. |
Ops |
Limited injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-2300 |
RG2 beam optimization |
Sun |
No Injection |
2300-2400 |
SR checkout |
Emery |
Stored beam & injection |
|
Tuesday June 24, 2025 |
|
|
0000-0400 |
ID perturbation |
Emery |
Stored beam & injection |
0400-0600 |
|
|
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |