Machine Studies

Draft Schedule for Run02-5, 2025

July 4 0000 – July 8 0800



Time

Descriptions

Studiers

SR Status


Friday, July 4, 2025



0000-0005

Reboot siocrunctrl2 and sioc2aop1

Ops

Stored beam & injection

0000-0400

SR beam decay

Diag group

Stored beam & injection

0800-1000

Tune BLS for 130 mA, any pattern with somewhat more than 48 bunches

Berenc

Stored beam & injection

1000-1200

Checkout SR Bpm offset measurement, 10 mA

Emery

Stored beam & injection

1200-1600

BTS images

Xu

Stored beam & Limited injection

1200-1600

One bunch SR beam measurements

Weixing

Stored beam & Limited injection

1600-1800

Operator training (08-18)

Ops

Limited Injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-2400

SR Bpm offset measurement, 10 mA

Emery Ops

Stored beam & injection


Saturday, July 5, 2025



0000-0400



Stored beam & injection

0400-0700



Stored beam & injection

0700-0900

Linac setup tool testing

Borland

Stored beam & No injection

0900

Inject 130 mA, any pattern (say 216 bunches)

Ops

Stored beam & injection

0900-1600

f_s measurement with beam decay, 130 mA

Kallakuri

Stored beam & No injection

0900-1600

Linac, PAR, Booster high charge

Sun, Mohsen, Calvey

Stored beam & No injection

1600-1800

Operator training (08-18)

Ops

Limited Injection

1800-2000

SR training (18-06)

Ops

Stored beam & injection

2000-2400

Transverse instability measurements

Lindberg, Emery, Dick

Stored beam & injection


Sunday, July 6, 2025



0000-0400

BTS response measurement

Sajaev

Stored beam & injection

0400-0800



Stored beam & injection

0800-1000

ID gap FF with new python version

Shang, Emery

Stored beam & injection

1000-1600

Tune and other magnet cycling for hysteresis error measurement

Chenran, Emery

Stored beam & injection

1600-1800

Operator training (08-18)

Ops

Limited Injection

1800-2000

SR training (18-06)

Ops

Stored beam & injection

2000-2400

LB+ cross-bar switching on/off testing

Cheng

Stored beam & injection


Monday, July 7, 2025



0000-0400

Other Bpm study

Cheng

Stored beam & injection

0400-0600



Stored beam & injection

0600-0800

Prepare for accesses

Ops and FAC

No Beam

0800-1000

Replace leaking flag actuator

Kisbaugh

Access Linac

0800-1000

Map video cables for PC gun and laser

Dooling

Access Linac

0800-0900

Swap L5:SC2:VL

PS group

No Injection

0800-1000

Connect external CT to L3:QM3

PS group

No Injection

0800-1000

Investigate P1K thyratron

Puttkammer

Access PAR

0800-1000

Upgrade Zone B PLC program

Ruan

No Beam

0800-1000

Investigate S01AQ3 60hz noise

Kreps

No Beam

0800-1000

RF wave-guide switch from RF1,2 & 5 to RF3,4 & 5;

RF group

No Beam

0800-0900

Update and restart SR magnet supplies

Brendan

No beam

0830-1000

34ID PSS commissioning/end to end test

SI Group

Access Zone E

0900-1000

Replace faled amplifier at S38 mezzanine

Kisbaugh

No Beam

0900-1000

Check dosfet cable at S12

Wei

Access Zone B

0900-1000

Add QR label at S14

Weghorn

Access Zone B

0930-1030

Check water flow at IEX

Wright

Access Zone D

1000-1030

ITS LDRD tour

Sun

Access ITS

1030-1300

Prepare the SR magnets

Ops

No beam

1030-1300

Check-out RF3 under power

RF group

No Beam

1300-1330

Test “Align P0” medm button, one bunch injected

Berkland

Stored beam & injection

1330-1600

Slow beam abort

Paskvan

No Beam

1330-1600

K1-based swap-out permissive testing. No beam required

Borland

No beam

1330-1600

Open to any injector beam tests

Mohsen, Calvey

No beam

1600-1800

Operator training (08-18)

Ops

Limited Injection

1800-2000

SR training (18-06)

Ops

Stored beam & injection

2000-2400

Final RF3 noise suppression and BLS tuning to perhaps > 130 mA

Berenc

Stored beam & injection


Tuesday, July 8, 2025



0000-0200

LFP checkout

Kallakuri

Stored beam & injection

0200-0600

Final setup for 48 bunches

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection