Machine Studies
Draft Schedule for Run02-7, 2025
July 21 0800 – July 23 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 21, 2025 |
|
|
0800-0830 |
Reboot iocrf5mon |
Ops |
Limited Injection |
0800-1000 |
Linac console testing |
Fystro/Lawson |
Limited Injection |
0800-1000 |
S3 &4 FOFB testing |
Carwardine |
No Beam |
0830-0900 |
Reboot sioc2injorch1 |
Fors |
No Beam |
0830-1000 |
Adjust BTS BESOCM |
Keane |
No Injection |
0830-1030 |
Upgrading PLC program for SR Raw Power Supplies in Zone B and C. |
Ruan |
No Beam |
0830-1130 |
Check FOK scope and DCCT studies |
Grass |
No Beam |
0830-1300 |
Booster extraction troubleshooting |
Madden |
No Injection/ Possible Booster Access |
0830-1030 |
IK waveform monitoring. Needs kicker magnets on. |
Paskvan |
No beam |
0900-1100 |
Connect streak camera |
Wootton |
No Beam |
0900-1300 |
Fix ID taper at S19 |
Wei |
Access Zone C |
0930-1100 |
Verify BPM serial numbers |
Weghorn |
Access Zone D |
1000-1100 |
RF shutter inspection |
MOM |
Access ITS |
1030-1100 |
Test LACIS E-stop |
Nguyen |
Access Linac |
1130-1400 |
PAR console testing |
Urban/Fystro |
Limited Injection |
1400-1630 |
Recover SR and Injectors |
Ops/FAC/HP |
Limited injection |
1530-1630 |
Set up reference tunes, coupling, chromaticities for later DA measurement |
Emery |
Stored beam & injection |
|
|
|
|
1630-2030 |
fast orbit feedback studies I |
Carwardine, Kallakuri et al |
Stored beam & injection |
2030-2200 |
Injector training (18-06) |
Ops |
Limited Injection |
2200-0200 |
DA measurements with injection kicker IK1 |
Borland |
Stored beam & injection |
|
Tuesday July 22, 2025 |
|
|
0200-0400 |
“drifting BPMs" with crossbar switch |
Cheng |
Stored beam & injection |
0400-0600 |
|
|
|
0600-0800 |
Hysteresis tests related to the K1 permissive |
Emery, Chenran |
Stored beam & injection |
0800-1200 |
test collect gap FF data script |
Shang |
Stored beam & injection |
0800-1100 |
test the streak camera in parallel with above |
Wootton |
Stored beam & injection |
1200-1600 |
fast orbit feedback studies II |
Carwardine, Kallakuri et al |
Stored beam & injection |
1600-1800 |
Injector training (06-18) |
Ops |
Limited Injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-2230 |
K1 permissive |
Borland |
Stored beam & injection |
2230-0030 |
Momentum acceptance measurements from rf scan, S40 RF off. |
Borland, Emery |
Stored beam & injection |
|
Wednesday July 23, 2025 |
|
|
0030-0400 |
measure the tune shift with charge, and more |
Lindberg, Emery, Dick |
Stored beam & injection |
0400-0600 |
Set up SR for operations |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |