Machine Studies

Draft Schedule for Run02-8, 2025

July 28 0800 – July 29 0800



Time

Descriptions

Studiers

SR Status


Monday, July 28, 2025



0800-0900

Script / screen checkout

Berkland

Stored Beam and Injection

0900-0930

Update DCCT and fokscope iocs

Grass

No Beam

0900-1000

Start DAQ aggregator

E. Chandler

No Beam

0900-1000

Update USPC ioc

B. Chandler

No Beam

0930-1130

Troubleshoot L3:QM3

PS Group

No Injection

0930-1130

Update SRPS Raw firmware

Ruan

No Beam

1000-1100

IETS reboot plus RF system down and then up

Fors, rf group

No beam

1000-1400

Fix 4ID taper

Wei

Access Zone A

1200-1400

Verify the new SR unipolar PS conditioning around this time before whole ring conditioning

Emery

Limited injection

1400-1530

Recover SR systems

Ops/FAC

Limited injection





1200-1600

Booster on-momentum operation. Part I: The Timing

Calvey

No Beam nor injection

1200-1600

SR kicker waveform monitoring

Paskvan

No Beam nor injection

1600-1800

Booster on-momentum operation. Part II: Injection into SR

Calvey, Emery

Stored Beam and Injection

1600-1800

Operator training (08-18)

Ops

Limited injection

1800-2000

Operator training (18-08)

Ops

Limited injection

2000-2200

Momentum aperture

Borland

Stored beam & injection

2200-0200

FOFB

Carwardine Kallakuri at al

Stored beam & injection


Tuesday July 29, 2025



0200-0500

BTS response measurement

Sajaev

Stored beam & injection

0500-0600

SR set up

Emery

Stored beam & injection

0530-0600

SR with drifting orbit

Emery, Cheng

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection