Machine Studies

Draft Schedule for Run03-10, 2025

November 17 0800 – November 18 0800



Time

Descriptions

Studiers

SR Status


Monday, November 11, 2025



0830-0930

Replace strobe for K1

Meyer

No Injection

0830-1000

PEM testing/ ioc reboots

Fystro/Paskvan

Limited injection

0830-1000

S03 FOFB synthetic measurements

Cheng

No Beam

0830-1030

PAR RF-1 digital LLRF adjustments

Berenc

No Injection

0830-1030

Update firmware

Kreps

No Beam

0900-1100

Take data on pulsing S:IS1

Puttkammer

No Beam

0900-1100

Test slow-MPS dump (kicking SR kickers and DK)

Paskvan

No Beam

0900-1200

Laser alignment

Dooling

Access Linac

0930-1130

Replace thermocouples

Weghorn

Access Zone D

1000-1200

Test K6 chassis

Yang

Limited injection

1130-1300

SR magnet recovery

Ops

Limited injection

1230-1530

Linac console testing

Lawson/Fystro

Limited injection









1530-1600

Orbit with S:M1 with lowered set point with I= 2 mA; Punch down S28BV8; Test some BTS one-iteration trajectory correction buttons

Emery

Limited Injection

1600-1800

PAR RF fundamental

Mohsen

Limited Injection

1600-1800

Operator SR training (08-18)

Ops

Limited injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-2400

DA optimization

Borland, Kuklev, Emery

Stored beam & injection


Tuesday November 18, 2025



0000-0400

HOM search

Kallakuri, Emery

Stored beam & injection

0400-0500

Open


Stored beam & injection

0500-0600

SR set up

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection