Machine Studies

Draft Schedule for Run03-11, 2025

November 27 0800 – November 28 0800



Time

Descriptions

Studiers

SR Status


Thursday, November 27, 2025



0000-0200

Checkout TFB for efficiency problems at 130 mA

Cheng, Emery

Stored beam & injection

0200-0400

Phase sensing with LFB front end

Kallakuri

Stored beam & injection

0400-0600

Open



0600-0800

Operator SR training (06-18)

Ops

Limited injection

0800-1400

BTS Sigma Matrix Measurement

C. Xu

Stored beam & injection

1400-1800

Study of aperture limits without collimators

Borland

Stored beam & injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-0200

Optimization of lifetime and efficiency

Borland, Kuklev, Emery

Stored beam & injection


Friday November 28, 2025



0200-0500

HOM search

Kallakuri, Emery

Stored beam & injection

0500-0600

SR set up, checkout 130 mA

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection