Draft Schedule for Run03-5, 2025
October 13 0800 – October 15 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 13, 2025 |
|
|
0830-1030 |
Update firmware |
Kreps |
No Beam |
0830-1030 |
M1 balancing |
Rafael |
No Beam |
0830-1030 |
FOFB testing |
Carwardine |
No Beam |
0900-1500 |
6ID front end repair and 16ID investigation |
Clute |
Access Zone A & B |
1000-1200 |
Laser alignment |
Dooling |
Access Linac |
1500-1700 |
Recover injectors and storage ring |
OPS |
Stored beam and injection |
1600-1800 |
Operator training (06-18) |
Ops |
Limited Injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-0200 |
Assess need for S01 collimator using vertical orbit to trip MPS |
Borland |
Stored beam & injection |
|
Tuesday October 14, 2025 |
|
|
0200-0300 |
Check high-intensity Robinson instability limit |
Emery |
Stored beam & injection |
0300-0700 |
BTS sigma matrix |
C. Xu |
Limited Injection |
0300-0700 |
FOFB |
Carwadine |
Limited Injection |
|
|
|
|
0730-1030 |
Spare DCCT repair |
Keane |
Access Zone F |
0700-1100 |
RG1 |
Sun |
Access Zone F |
1030-1230 |
Recover injectors and storage ring |
OPS |
Stored beam and injection |
1230-1600 |
LFB phase sensing using borrowed 1.4 Ghz front-end in TFB |
Kallakuri |
Stored beam and injection |
1600-1800 |
Operator training (06-18) |
Ops |
Limited Injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-0000 |
DA/LMA aperture |
Borland |
Stored beam & injection |
|
Wednesday October 15, 2025 |
|
|
0000-0100 |
LFC beam motion |
Borland |
Stored beam & injection |
0100-0400 |
Tune measurement of magnet hysteresis error |
C. Xu |
Stored beam & injection |
0400-0600 |
Set up SR for operations |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |