Machine Studies
Draft Schedule for Run03-7, 2025
October 27 0800 – October 28 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 27, 2025 |
|
|
0830-0930 |
Swap SR DCCT DVMs |
Keane |
No Beam |
0830-0930 |
Study LB+ |
Grass |
No Beam |
0830-1030 |
SR septum supply measurements |
Abid |
No Beam |
0830-1030 |
Upgrade unipolar PS firmware |
Kreps |
No Beam |
0830-1130 |
PAR RF-1 tuner PS investigations |
Berenc |
No Injection |
0830-1130 |
DK and IK digitizer |
Paskvan |
No Beam |
0830-1430 |
Testing of PAR amplifier/possible switch to tube amplifier |
Smith, Mohsen |
Limited Injection |
0830-1430 |
Replace filter in BLS LN2 phase separator bayonet connection |
Fuerst |
No Beam |
1430-1600 |
Recover SR and injectors |
OPS |
Stored Beam and Injection |
|
|
|
|
1600-1800 |
Operator training (08-18) |
Ops |
Limited injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-2400 |
DA with various chromaticity values |
Borland Emery |
Stored Beam and Injection |
|
Tuesday October 28, 2025 |
|
|
0000-0400 |
IIR filtering and its response;Effect of crossbar switch to Spark BPMs |
Weixing |
Stored beam & injection |
0000-0400 |
FOFB (in parallel with Weixing) |
Carwardine |
Stored beam & injection |
0400-0500 |
Open |
|
Stored beam & injection |
0500-0600 |
SR final checkout |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |