Machine Studies

Draft Schedule for Run03-8, 2025

November 3 0800 – November 5 0800



Time

Descriptions

Studiers

SR Status


Monday, November 3, 2025



0815-1200

Replace PAR-12 amplifier

Smith

No Injection

0830-0930

ITS cable pull

Dooling/HP/MOM

No Injection

0830-1030

Troubleshoot PAR septum

Puttkammer

No Injection

0830-1030

Test run and measure B:IS

Abid

Limited Injection

0830-1030

Investigate M1 imbalance

Rafael

No Beam

0830-1030

Upgrade L3:QM3

Yang

No Injection

0830-1130

investigate a tuner issue at S37

Madden

No Beam

0900-1000

Replace RF-4 klystron blower

Wright

No Beam (Access not required)

0900-1100

Deploy new IOCs for IES and LB+

Grass

No Beam

0900-1100

Replace opto-isolator chassis for PAR RF-1

Berenc

No Injection

0900-1500

Vibration measurements

Preissner

Access Zone A & B All SR pumps and PS off

0930-1130

Linac cable pull

Dooling/HP/MOM

Access Linac

0930-1130

Replace Flag Actuation Interlock Chassis

Kishbaugh

Access Linac

1100-1300

Ramp FID at S38 & 39

Grass

No Beam

1300-1130

Update S39 digitizer of IK no beam

Paskvan

No Beam

1200-1400

Set up RF12 in PAR

Mohsen Berenc

No Beam

1400-2000

High charge set up PAR/Booster

Mohsen Calvey

No Beam, mostly

1500-1700

SR zones, pumps, and magnet recovery

Ops MOM

Limited Injection

1600-1800

Operator training (06-18) cancelled

Ops

Limited Injection

2000-2200

Operator training (18-06)

Ops

Limited Injection

2200-2400

Test DA measurement using faster ramp rate for kickers

Borland

Stored beam & injection


Tuesday November 4, 2025



0000-0400

Testing of software for DA and lifetime optimization

Borland, Kuklev, Emery

Stored beam & injection

0400-0800

S36 temperature scan > 73 deg F for stable setting. 200 mA, 216 bunches

Kallakuri Emery

Stored beam & injection

0800-1200

FOFB

Carwardine Kallakuri

Stored beam & injection

1200-1300

Check steering with x-ray bpms

Emery Dick

Stored beam & injection

1300-1600

BLS tuning for 48 bunches

Kelly, Fuerst

Stored beam & injection

1300-1600

IIR filtering and its response; Effect of crossbar switch to Spark BPMs


Cheng

Stored beam & injection

1600-1800

Operator training (06-18)

Ops

Limited Injection

1800-2000

Operator training (18-06)

Ops

Limited Injection

2000-0000

BTS sigma

Xu

Limited Injection


Wednesday November 5, 2025



0000-0200

LFB setup for operations, 48 bunches

Kallakuri

Stored beam & injection

0200-0500

RG1

Sun

Stored beam & injection

0500-0600

Set up SR for operations

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection