November 10 0800 – November 11 0800



Time

Descriptions

Studiers

SR Status


Monday, November 10, 2025



0830-0900

Reboot iocbacnet

Smith

Limited impact

0830-1030

Update SR firmware

Kreps

No Beam

0830-1030

B:IS measurements

Abid

No Injection

0830-1030

Fix S12:13 temp readbacks

Ruan

No Beam

0900-1000

Reboot iocsrmon

DiMonte

No Beam

0900-1100

Investigate S17 ioc pump warnings

Clute

Access Zone B

0930-1100

Replace S35BM ion pump cable

Vacuum

Access Zone F

1100-1230

Recover SR magnets

Ops

No Beam





0900-1100

PAR fundamental (with linac beam)

Berenc

Linac + PAR beam

0900-1100

Test of PAR and Booster bypass (no beam in bypass)

Sun

Linac + PAR beam

1100-1200

Test of PAR and Booster bypass (beam in bypass)

Sun

Linac beam

1200-1400

PAR RF12

Mohsen

Linac + PAR beam

1400-1500

Check of SBPMs restore (and other sundry items)

Emery, Cheng, Wang

Stored beam & injection

1500-1600

Test of SRorbitConfig

Shang

Stored beam & injection

1600-1800

Operator SR training (08-18)

Ops

Limited injection

1800-2000

Injector training (18-06)

Ops

Limited Injection

2000-2400

FOFB

Carwardine

Stored beam & injection


Tuesday November 11, 2025



0000-0400

DA optimization

Borland, Kuklev, Emery

Stored beam & injection

0500-0600

SR set up

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection