Machine Studies
Draft Schedule for Run03-9, 2025
November 10 0800 – November 11 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, November 10, 2025 |
|
|
0830-0900 |
Reboot iocbacnet |
Smith |
Limited impact |
0830-1030 |
Update SR firmware |
Kreps |
No Beam |
0830-1030 |
B:IS measurements |
Abid |
No Injection |
0830-1030 |
Fix S12:13 temp readbacks |
Ruan |
No Beam |
0900-1000 |
Reboot iocsrmon |
DiMonte |
No Beam |
0900-1100 |
Investigate S17 ioc pump warnings |
Clute |
Access Zone B |
0930-1100 |
Replace S35BM ion pump cable |
Vacuum |
Access Zone F |
1100-1230 |
Recover SR magnets |
Ops |
No Beam |
|
|
|
|
0900-1100 |
PAR fundamental (with linac beam) |
Berenc |
Linac + PAR beam |
0900-1100 |
Test of PAR and Booster bypass (no beam in bypass) |
Sun |
Linac + PAR beam |
1100-1200 |
Test of PAR and Booster bypass (beam in bypass) |
Sun |
Linac beam |
1200-1400 |
PAR RF12 |
Mohsen |
Linac + PAR beam |
1400-1500 |
Check of SBPMs restore (and other sundry items) |
Emery, Cheng, Wang |
Stored beam & injection |
1500-1600 |
Test of SRorbitConfig |
Shang |
Stored beam & injection |
1600-1800 |
Operator SR training (08-18) |
Ops |
Limited injection |
1800-2000 |
Injector training (18-06) |
Ops |
Limited Injection |
2000-2400 |
FOFB |
Carwardine |
Stored beam & injection |
|
Tuesday November 11, 2025 |
|
|
0000-0400 |
DA optimization |
Borland, Kuklev, Emery |
Stored beam & injection |
0500-0600 |
SR set up |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |