Draft Schedule for Run01-12, 2026

April 22 0800 – April 22 2400



Time

Descriptions

Studiers

SR Status


Wednesday, April 22, 2025



0800-0900

FOFB preparation. Shutters closed

Carwardine, floor coordinators

Stored Beam and Injection

0900-1100

Open shutters with FOFB running

Carwardine and some beamlines

Stored Beam and Injection

1100-1200

More FOFB characterization

Kallakuri

Stored Beam and Injection

1200-1300

RF SR pem testing for SSA cavity

Berkland, fystro, Soliday

No beam

1200-1300

Start a new IOC to monitor traffic (parasitic)

Smith

No beam

1200-1400

Beam sigma measurement on LTP. Allow injection of SR at 1300h

Chenran

Stored Beam and Limited Injection

1300-1400

Orbit response measurement 10 mA

Dick

Stored Beam and Limited Injection

1400-1600

Booster orbit effect on rad monitors

Calvey

Stored Beam and Injection

1600

Inject 200 mA, 216 bunches for decay

Emery

Stored Beam and Limited Injection

1600-2200

PAR Harmonic Voltage Modulation Studies

Mohsen, Calvey, Berenc

Stored Beam and Limited Injection

2200-2400

S40 cavity temperature scan 200 mA, 216 bunches

Kallakuri Emery

Stored Beam and Injection