Machine Studies
Draft Schedule for Run06-2, 2025
February 09 0800 – February 11 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 9, 2025 |
|
|
0830-1030 |
DAQ TBT and PS ioc updates |
E. Chandler |
No Beam |
0830-1030 |
Update DCCT auto range increment/Update spark bpm ioc for LEA |
Grass |
No Beam (DCCT)/No Impact (LEA) |
0800-1100 |
RF-3 measurements / power monitor swap |
RF Group |
No Beam Zone F in Beam Permit |
0830-1030 |
PC gun drive laser alignment |
Dooling |
Access Linac |
0900-1000 |
Vibration measurements |
Preissner |
Access Zone A |
1130-1300 |
Check Linac running with 136MHz clock |
Hong |
Access Zone F |
1130-1300 |
Mount ion probe and neutron probe on the roof of 38-AM |
HP group |
Access Zone F |
1130-1230 |
Vibration measurements |
Preissner |
Access Zone F |
1130-1300 |
Install and test the S38 collimator viewport camera |
Dooling |
Access Zone F |
1300-1400 |
SR RF recovery |
RF group |
Limited availability |
1300-1400 |
Test of RF detectors |
M. Smith |
Limited availability |
1400-1600 |
SR console testing |
Novencido/Berkland |
Limited availability |
1600-1800 |
TFB timing. reproduce problems on Wed. 2/4/2026 |
Kallakuri |
Stored beam & injection |
1800-2000 |
Operator training (18-06) |
|
Stored beam & injection |
2000-0200 |
S09 R5 FOFB |
Weixing, Carwardine |
Stored beam & injection |
|
Tuesday, February 10, 2025 |
|
|
0200-0400 |
Update linac lattice for RG2 beam |
Sun |
Stored beam & no injection |
0400-0700 |
PAR bypass emittance measurement |
Sun |
Stored beam & no injection |
0700-1000 |
Operator console testing (06-18) |
Fystro/McBride |
Limited injection |
1000-1400 |
MOBO for lifetime, efficiency using 24 families |
Kuklev, Borland, Emery |
Stored beam & injection |
1400-1800 |
Measure bunch length vs number of bunches and total current to determine gas- and Touschek-scattering components |
Borland, Xiang Sun |
Stored beam & injection |
1800-2000 |
Operator training (18-06) |
|
Stored beam & injection |
2000-2200 |
PAR bunch length data |
Dooling, Mohsen |
Stored beam & limited injection |
2200-0100 |
Hysteresis error measurement on SR |
Xu |
Stored beam & injection |
|
Wednesday, February 11, 2025 |
|
|
0100-0400 |
Mode 0 measurement and stability |
Kallakuri, Emery |
Stored beam & injection |
0400-0600 |
Set up SR for operations |
Emery, Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |