Machine Studies

Draft Schedule for Run01-3, 2026

February 16 0800 – February 17 0800



Time

Descriptions

Studiers

SR Status


Monday, February 16, 2025



0800-0830

Response matrix measurement at 10 mA. Injection stops at 0830h. Stored beam present till 0900h if needed.

Emery

Stored beam & injection

0800-0900

Update UPSC iocs

B. Chandler

No Impact

0800-1000

Test non production ioc sioc2lbatten

Grass

No Impact

0830-1230

Swap out PTB:Q7 and re-optimize injection

Puttkammer/Fystro

No Injection

0900-1200

Alarms on SR IK waveforms

Paskvan Grass

No Beam

0900-0930

Switch RF-3 water pump

Wright

No Beam

0900-1000

Install new virtual cathode camera/laser alignment

Dooling

Access Linac

0900-1000

Troubleshoot shutter #2 micro switches

Smith

Access ITS K1-3 down

0900-1000

Check magnet polarity in ITS

Sun Xu

Access ITS K1-3 down

0900-1000

Troubleshoot FOK counter

Abid

No Beam

0930-1130

Make FODO adjustments

Preissner/SVY

Access Zone C





1200-1330

SR recovery

Ops

Stored beam & injection

1330-1420

Recover orbit at 10 mA due to FODO cell perturbation, condition magnets to check effect on correctors

Emery Dick Xu

Stored beam & injection

1420-1440

Check injection timing errors

Fors Emery

Stored beam & injection

1440-1700

Measure response at 10 mA, correct optics, characterize lifetime at 200 mA

Emery Dick Xu

Stored beam & injection

1700-2000

Booster chromaticity correction. No SR rf

Calvey, Shang, Fors

No beam

1830-2000

Measure (some) bunch length vs number of bunches and total current to determine gas- and Touschek-scattering components

Borland, Xiang Sun

Stored beam & injection

2000-2400

MOBO for lifetime, efficiency using 24 families

Kuklev, Borland, Emery

Stored beam & injection


Tuesday February 17, 2025



0000-0400

FOFB in S09

Carwardine

Stored beam & injection

0400-0600

SR set up

Emery Berkland

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection