Machine Studies
Draft Schedule for Run01-4, 2026
February 23 0800 – February 25 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, February 23, 2025 |
|
|
0800-0830 |
Prepare for 324 bunches and set S36C1 phase correctly |
Emery, Madden |
Stored beam and injection |
0830-1230 |
324 singlets experiment |
AOP/Selected users |
Stored beam and injection |
1230-1300 |
Measure Orbit response |
Emery |
Stored beam and injection |
1300-1600 |
PAR RF12 study |
Mohsen |
Storead beam & Limited injection |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2000 |
Operator training |
Ops |
Stored beam & injection |
2000-2400 |
LFB tuning and Injection phase tuning |
Kallakuri Emery |
Stored beam & injection |
|
Tuesday, February 24, 2025 |
|
|
0000-0400 |
S09 FOFB Part I |
Carwardine |
Stored beam & injection |
0400-0800 |
PTB optimization |
Calvey, Fystro, Mohsen |
Stored beam & injection |
|
Start of interventions |
|
|
0800-1200 |
Spot knock RF-5 |
RF Group |
No Injection |
0800-1600 |
SSA work |
RF Group |
No Beam |
0830-0930 |
Install ITS jumper |
Lenner |
No Injection |
0830-1030 |
Laser alignment |
Dooling |
Access Linac |
0830-1030 |
Test the LB+ synthetic data with FOFB and BPLD |
Weixing |
No Beam |
0830-1500 |
Remove ITS shutters |
Clute/RF Group |
Access ITS (possibly Linac as well) |
0900-1100 |
Troubleshoot and repair thermocouple |
Weghorn |
Access Zone F |
0900-1200 |
FODO adjustments |
Preissner/Survey |
Access Zone F |
1000-1200 |
Troubleshoot PTB:Q7 |
Puttkammer |
Access Booster |
1200-1400 |
Investigate 10-BM PS2 fault |
Clute |
Access Zone B |
1200-1500 |
FODO adjustments |
Preissner/Survey |
Access Zone B |
1300-1500 |
FOK measurements |
Abid |
No Beam |
|
End of interventions |
|
|
1500-1600 |
SR recovery (may spill over to training period) |
Ops |
|
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2000 |
Operator training |
Ops |
Stored beam & injection |
2000-2400 |
Measure bunch length and lifetime as a function of number of bunches and total current |
Borland, X. Sun |
Stored beam & injection |
|
Wednesday, February 25, 2025 |
|
|
0000-0400 |
S09 FOFB Part II |
Carwardine |
Stored beam & injection |
0400-0600 |
Set up SR for operations + orbit response and chromaticity measurements |
Emery, Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |