Machine Studies
Draft Schedule for Run01-5, 2026
March 2 0800 – March 3 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 2, 2025 |
|
|
0800-0830 |
Response matrix measurement at 10 mA. Injection stops at 0830h. Stored beam present till 0900h if needed. |
Emery |
Stored beam & injection |
0830-1130 |
PAR RF12 DLLRF adjustment. Need PAR beam. |
Mohsen, Berenc |
No Beam |
0900-1100 |
IES DG testing /LB+ FrozenM update |
Grass |
No Beam |
0900-1100 |
Investigate/swap-out SR Converter S24:AQ4 power supply |
Vargas |
No BeamNo Beam |
0900-1230 |
Update PS controller iocs and add diagnostics |
B. Chandler |
No Beam |
0900-1100 |
DAQ IOC work |
E. Chandler |
No Beam |
0930-1130 |
Repair water leak |
Moonier |
Access Zone F |
0930-1130 |
Troubleshoot repair S38B:P6 |
Kishbaugh |
Access Zone F |
1130-1230 |
Verify the water flow switch in the PAR Dipole power supply. Check with RF12 studiers if time is really available. |
Puttkammer |
No Injection |
1130-1230 |
Run PAR Dipole and Kickers power supplies at the 450Mev energy Check with RF12 studiers if time is really available. |
Rafael |
No Injection |
1230-1330 |
Investigate FOK in SR |
Abid |
No Beam |
1230-1400 |
SR recovery |
Ops |
Stored beam & injection |
1400-1600 |
M1/M2 power supply “glitch” measurements. Take PSDAQ and TBTDAQ data. 10 mA. |
Paskvan |
Stored beam & injection |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2000 |
Operator training |
Ops |
Stored beam & injection |
2000-2200 |
Examine excessive IEX orbit perturbation seen last week |
Emery Chenran |
Stored beam & injection |
2200-2400 |
Testing tune knobs. 10 mA. |
Chenran |
Stored beam & injection |
|
Tuesday March 3, 2025 |
|
|
0000-0400 |
FOFB in S09 |
Carwardine |
Stored beam & injection |
0400-0600 |
SR set up |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |