Machine Studies
Draft Schedule for Run01-6, 2026
March 9 0800 – March 11 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, March 9, 2025 |
|
|
0800-0830 |
Response matrix measurement at 10 mA. Injection stops at 0830h. Stored beam present till 0900h. Measure S40A:P1 offset. |
Emery |
Stored beam & injection |
0900-1200 |
Move the BPSC IOCs to a new machine |
B. Chandler |
No Beam |
0900-1300 |
Spotknock RF-5 replace Bergoz card |
Weyer |
No Injection |
0930-1130 |
Let the L3 RF triggers follow the laser / PC Gun |
Hong |
Limited Injection |
0930-1130 |
Laser alignment |
Dooling |
Access Linac |
0930-1130 |
Investigation on power supply / rack for BTS:BSQ1 |
Jordan/FAC |
No Injection |
1000-1200 |
BST camera controls scripts. No beam |
Shang |
Access Zone F |
1000-1100 |
Adjust BLS cryostat valves |
Fuerst |
Access Zone F |
1000-1100 |
Troubleshoot thermocouple |
Weghorn |
Access Zone F |
1000-1130 |
FODO measurements |
Preissner |
Access Zone A |
1200-1300 |
Investigate FOK counts |
Abid |
No Beam |
|
End of interventions |
|
|
1300-1600 |
SR console testing. SR presumed recovered at the end. |
Weber/Berkland |
Beam not available |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2000 |
M1/M2 and DAQ system 10 mA. Inject once |
Paskvan |
Stored beam & injection |
1800-2100 |
Linac setup: Recover K2 rf power level to 145 MW; Test K3 timing switch |
Yine Meyer Hong Mohsen |
Stored beam & No injection |
2000-2200 |
SR IK no beam; M1/M2 conditioning |
Paskvan |
No Beam |
2100-0100 |
PAR high charge |
Mohsen, Calvey |
Stored beam & Limited injection |
|
Tuesday, March 10, 2025 |
|
|
0100-0300 |
Operator training |
Ops |
Stored beam & injection |
0300-0700 |
PTB optimization |
Calvey Fystro Mohsen Fors? |
Stored beam & Limited injection |
0700-1100 |
Booster high charge |
Calvey Mohsen Fystro |
Stored beam & Limited injection |
1100-1200 |
BLS setup for 130 mA and 48 bunches |
Fuesrt Kelly Emery Kallakuri |
Stored beam & injection |
1200-1400 |
LFB checkout for 130 mA |
Kallakuri Emery |
Stored beam & injection |
1400-1600 |
BTS emittance measurement |
Shang Chenran |
Stored beam & injection |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
|
|
|
|
1800-2000 |
SR horizontal collimators |
Borland Dick |
Stored beam & injection |
2000-2400 |
Measure bunch length and lifetime as a function of number of bunches and total current |
Borland, Sun |
Stored beam & injection |
|
Wednesday, March 11, 2025 |
|
|
0000-0400 |
S09/S37 FOFB |
Cheng, Carwardine |
Stored beam & injection |
0400-0600 |
Set up SR for operations + orbit response and chromaticity measurements |
Emery, Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |