Machine Studies

Draft Schedule for Run01-7, 2026

March 16 0800 – March 17 0800



Time

Descriptions

Studiers

SR Status


Monday, March 16, 2025



0800-0900

FOFB rehearsal

Carwardine

Stored beam & injection

0900-1000

Response matrix measurement at 10 mA. Injection stops at 0930h. Stored beam present till 1000h if needed.

Dick Emery

Stored beam & injection

1000-1200

SR console testing

Weber/Berkland

Limited availability

1130-1330

Laser alignment

Dooling

Access Linac

1200-1300

Reboot siocrunctrl2

Xu

No Beam

1200-1300

Turn on S38 gas analyzers

Clute

No Beam

1200-1400

Update LB+ Atten IOC

Grass

No Beam

1200-1400

Investigate FOK

Abid

No Beam

1200-1400

Revert BP Controller in SR Sector 9-5a

Kreps

No Beam

1200-1400

Measure impedance on magnet PTB:Q4

Puttkammer

No Beam

1200-1400

Update MOFB to support setting custom feedback intervals.

E. Chandler

No Beam

1400-1600

M1/M2 power supply “glitch” measurements. Take PSDAQ and TBTDAQ data. 10 mA.

Paskvan

Stored beam & injection

1600-1800

SSA loop tuning for 2.7 mA single bunch injection

Madden Emery

Stored beam & injection

1600-1800

Operator training

Ops

Stored beam & injection

1800

Fill some current in the ring to test some MOFB intervals

Ops Emery

Stored beam & injection

1800-2000

Operator training

Ops

Stored beam & injection

1800-2000

PAR bypass lattice matching tool testing. Need linac beam.

Y. Sun

Stored beam & No Injection

2000

Fill some current in the ring to test some MOFB intervals, if needed

Ops Emery

Stored beam & injection

2000-2200

PAR high charge

Mohsen

Stored beam & limited injection

2200-2400

BTS emittance measurement script

Chenran, Shang

Stored beam & limited injection


Tuesday March 17, 2025



0000-0400

FOFB in S09

Carwardine

Stored beam & injection

0400-0600

SR set up

Emery

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection