Machine Studies

Schedule for Run26-2, 2026

May 21st 0800 – May 27th, 0800



Time

Descriptions

Studiers

SR Status


Thursday, May 21, 2026



0000-0400

General machine start-up

Technical groups

No Stored Beam

0400-0800

General machine start-up

Technical groups

No Stored Beam

0800-0900

0.5 mA ID gaps open MPS validation with all SR RF systems

Ops

Stored Beam & Injection

0900-0900

Check MOFB 5 mA ID gaps open

Emery

Stored Beam & Injection

0900-1200

BM BPLD validations 5 mA

Bui, Shang, Smith

Stored Beam & Injection

1200-1400

Dimtel LFB/TFB timing checks 1 mA ID gaps closed from here on

Kallakuri

Stored Beam & Injection

1400-1600

S38 collimator positioning using postmortems 5 mA

Borland, Dick

Stored Beam & Injection

1600

Setup BLS tuning for 200 mA before filling > 20 mA

Emery Fuerst

Stored Beam & Injection

1600-2400

RF conditioning with beam with 216 bunches. S36 cavities phases roughly optimized. Need to maintain BLS 1.0 MV.

Emery Ops

Stored Beam & Injection

2000-2400

LFB setup for 216 bunches at moderate current (could start later than expected)

Kallakuri

Stored Beam & Injection


Friday, May 22, 2026



0000-0700

RF conditioning with beam with 216 bunches. 200 mA

Ops

Stored Beam & Injection

0400-0700

Parasitic bunch length measurement with S37 fast scope (could start earlier)

Cheng

Stored Beam & Injection

0700-0800

Setup BEFI

Bruno

Stored Beam & Injection


Start of machine studies proper



0800-0945

M1/M2 interlock test with beam

Borland Smith

Stored Beam & Injection

0945-1000

BEFI final check with shutters open

Bruno, floor coordinators

Stored Beam & Injection

1000-1200

Checkout simultaneous steerings for IDs, Also add FOFB setpoint PVs to knobs

Emery Shang

Stored Beam & Injection

1200-1400

Empirical coefficients of CU steering

Emery Shang

Stored Beam & Injection

1400-1600

Test different swap-out intervals and injector enable times.

Berkland Fystro

Stored Beam & Injection

1600-1900

BTS quad scan measurement + camera setup

Chenran

Stored Beam & Injection

1600-2200

Orbit response and optics correction. (split time with above to allow calculations)

Emery, Xu, Dick

Stored Beam & Injection

2200-0200

Long term stability with MOFB off

Cheng

Stored Beam & Injection


Saturday, May 23, 2026



0200-0400

BPM offset measurement. S23BP0 and S30AP5

Emery Cheng

Stored Beam & Injection

0400-0600

Operator training (night shift)

Ops

Stored Beam & Injection

0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1200

Testing S09 FOFB setup for user operations. Check with ID steering.

Carwardine Kallakuri

Stored Beam & Injection

1200-1600

BLS quench investigation of 130 mA decays in 48 bunches

Emery Fuerst

Stored Beam & Injection

1600-1900

ID perturbation measurement that includes ID01, during linac study

Emery

Stored Beam & No Injection

1600-1900

linac beam emittance

Chenran

Stored Beam & No Injection

1900-2100

Operator training (night shift)

Ops

Stored Beam & Injection

2100-2400

Open


Stored Beam & Injection


Sunday, May 24, 2026



0000-0400

SR magnet family conditioning out of order with orbit response measurement

Emery

Stored Beam & Injection

0200-0600

Open



0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1000

MPS ready fault while injecting the 1st bunch

Cheng

Stored Beam & Injection

1000-1200

BPM sum versus bunch length. Need to very RF voltages.

Cheng

Stored Beam & Injection

1200-1400

Open


Stored Beam & Injection

1600-2400

Low-beta lattice commissioning

Borland Emery Dick

Stored Beam & Injection


Monday, May 25, 2026



0000-0200

Operator training (night shift)

Ops

Stored Beam & Injection

0200-0600

Open



0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1100

HOM search in sector 40

Kallakuri, Emery

Stored Beam & Injection

1100-1300

Optimize S36 phases more precisely with f_s measurements

Kallakuri, Emery

Stored Beam & Injection

1300-1600

Grow-damp measurements of LFB

Kallakuri, Emery

Stored Beam & Injection

1600-1800

Open



1800-2000

Operator training (night shift)

Ops

Stored Beam & Injection

2000-2400

Open


Stored Beam & Injection


Tuesday, May 26, 2026



0000-0500

Open


Stored Beam & Injection

0500-0600

FOFB operator training

Berkland

Stored Beam & Injection

0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1100

Reduce SR IK settings while maintaining good efficiency.

Emery Dick

Stored Beam & Injection

1100-1300

IEX speed up tests

Emery Smith

Stored Beam & Injection

1300-1500

Stored beam monitor tests with decay (cancelled last run)

Berkland Fystro

Stored Beam & Injection

1500-1600

FOFB operator training

Berkland

Stored Beam & Injection

1600-1800

Open


Stored Beam & Injection

1800-2000

Operator training (night shift)

Ops

Stored Beam & Injection

2000-0200

24 sextupole families optimization

Kuklev Borland Emery

Stored Beam & Injection


Wednesday, May 27, 2026



0200-0400

Open


Stored Beam & Injection

0400-0600

Final check of lattice

Emery Dick

Stored Beam & Injection

0600-0800

Prepare for User Beam Operations 200 mA – 216 bunches

OPS

Stored Beam & Injection