Draft Schedule for Run02-2, 2026

June 1 0800 – June 3 0800



Time

Descriptions

Studiers

SR Status


Monday, June 1, 2025



0800-1000

Check M1 M2 imbalance

PS group

No Beam

0800-1000

Reboot IOCs and test Booster ramps

Xu

No Beam

0800-0900

Add trigger output for S37 and S39 BLMs

Hong

No Beam

1000-1300

SR console testing

Novencido/Berkland

Stored Beam and Injection

1300-1330

Run linac with 136 MHz clock

Hong

Stored Beam and Injection

1330-1530

M1/M2 Interlock

Smith Borland

Stored Beam and Injection

1530-1800

BTS quad offset

Chenran

Stored Beam and Limited Injection

1530-1600

ID01 BPLD validation

Bui

Stored Beam and Limited Injection

1800-2400

Low betay study (could start earlier)

Borland Sajaev Emery

Stored Beam and Injection


Tuesday, June 2, 2025



0000-0200

SR magnet family conditioning out of order with orbit response measurement.

Emery

Stored Beam and Injection

0200-0400

Check running at 4.8 MV with 11 cavities and 160 mA to increase lifetime

Emery Kallakuri

Stored Beam and Injection

0400-0600

Open loop stability at high current

Kallakuri

Stored Beam and Injection

0600-0800

Operator Training


Stored Beam and Injection

0800-1000

Troubleshoot PAR dipole

Puttkammer

Limited Injection

0800-1200

SR RF waveguide switch

RF group

No Beam

0800-1200

Repair and validate the S36-C4 circulator. If takes longer then following time slots for Booster and SR can overlap

RF group

No Beam

0800-1200

Install monitoring scopes on S36 vacuum interlock system

RF group

No Beam

0900-1100

PAR fundamental tuner studies

Berenc

Limited Injection

1100-1200

Restore linac to 119 MHz

Hong

Limited Injection

1200-1300

Fill ring to 200 mA (or find maximum) with all 12 cavities working. Check RF4 phase.

Emery

Stored Beam and Injection

1300-1700

run FOFB with two sectors simultaneously.

Carwardine

Stored Beam and Injection

1700-2000

Booster Orbit

Calvey Fystro

Stored Beam and Limited Injection

1700-1900

CU steering server test. Need stored SR beam

Shang Emery

Stored Beam and Limited Injection

2000-2200

ID perturbation measurement that included ID01 (may overlap with earlier booster slot)

Emery

Stored Beam and Injection

2200-2400

Fix coupling in SR (may start early)

Emery

Stored Beam and Injection


Wednesday, June 3, 2025



0000-0200

Set up SR for operations + orbit response and chromaticity measurements

Emery

Stored beam & injection

0200-0400

Operator training

Ops

Stored beam & injection

0400-0600

Open


Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection