Machine Studies
Draft Schedule for Run02-2, 2026
June 1 0800 – June 3 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, June 1, 2025 |
|
|
0800-1000 |
Check M1 M2 imbalance |
PS group |
No Beam |
0800-1000 |
Reboot IOCs and test Booster ramps |
Xu |
No Beam |
0800-0900 |
Add trigger output for S37 and S39 BLMs |
Hong |
No Beam |
1000-1300 |
SR console testing |
Novencido/Berkland |
Stored Beam and Injection |
1300-1330 |
Run linac with 136 MHz clock |
Hong |
Stored Beam and Injection |
1330-1530 |
M1/M2 Interlock |
Smith Borland |
Stored Beam and Injection |
1530-1800 |
BTS quad offset |
Chenran |
Stored Beam and Limited Injection |
1530-1600 |
ID01 BPLD validation |
Bui |
Stored Beam and Limited Injection |
1800-2400 |
Low betay study (could start earlier) |
Borland Sajaev Emery |
Stored Beam and Injection |
|
Tuesday, June 2, 2025 |
|
|
0000-0200 |
SR magnet family conditioning out of order with orbit response measurement. |
Emery |
Stored Beam and Injection |
0200-0400 |
Check running at 4.8 MV with 11 cavities and 160 mA to increase lifetime |
Emery Kallakuri |
Stored Beam and Injection |
0400-0600 |
Open loop stability at high current |
Kallakuri |
Stored Beam and Injection |
0600-0800 |
Operator Training |
|
Stored Beam and Injection |
0800-1000 |
Troubleshoot PAR dipole |
Puttkammer |
Limited Injection |
0800-1200 |
SR RF waveguide switch |
RF group |
No Beam |
0800-1200 |
Repair and validate the S36-C4 circulator. If takes longer then following time slots for Booster and SR can overlap |
RF group |
No Beam |
0800-1200 |
Install monitoring scopes on S36 vacuum interlock system |
RF group |
No Beam |
0900-1100 |
PAR fundamental tuner studies |
Berenc |
Limited Injection |
1100-1200 |
Restore linac to 119 MHz |
Hong |
Limited Injection |
1200-1300 |
Fill ring to 200 mA (or find maximum) with all 12 cavities working. Check RF4 phase. |
Emery |
Stored Beam and Injection |
1300-1700 |
run FOFB with two sectors simultaneously. |
Carwardine |
Stored Beam and Injection |
1700-2000 |
Booster Orbit |
Calvey Fystro |
Stored Beam and Limited Injection |
1700-1900 |
CU steering server test. Need stored SR beam |
Shang Emery |
Stored Beam and Limited Injection |
2000-2200 |
ID perturbation measurement that included ID01 (may overlap with earlier booster slot) |
Emery |
Stored Beam and Injection |
2200-2400 |
Fix coupling in SR (may start early) |
Emery |
Stored Beam and Injection |
|
Wednesday, June 3, 2025 |
|
|
0000-0200 |
Set up SR for operations + orbit response and chromaticity measurements |
Emery |
Stored beam & injection |
0200-0400 |
Operator training |
Ops |
Stored beam & injection |
0400-0600 |
Open |
|
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |