Draft Schedule for Run02-5, 2026

June 22 0800 – June 23 0800



Time

Descriptions

Studiers

SR Status


Monday, June 22, 2026



0800-0830

Response matrix measurement at 10 mA. Injection stops at 0830h. Stored beam present till 0900h if needed.

Dick

Stored beam & injection

0900-1100

Adjust pressure on water branch supplying S36 SSA loads

Swetin

No Beam

0900-1100

Reboot and test H-Colimator motor's alarm limit

Grass

No Beam

0900-1100

Update DAQ TBT and DAQ PS IOC and services

Chandler

No Beam

0900-1100

BLS studies. No beam.

Berenc/Kelly

No Beam

0900-1100

Calibrate BIS

Abid

No Injection

0900-1100

Investigate Par Dipole Output Current

Puttkammer

No Injection

0900-1100

move the P2IK injection discharge trigger

Hong

No Injection

1100-1300

PAR Harmonic RF Feedback Characterization

Berenc

Limited Injection

1300-1310

Fill some beam in SR to decay for any purpose

Ops

Stored beam & injection

1300-1700

Linac tune up for injector high charge

Sun

Stored beam & Limited injection

1700-1800

Injector training (08-18). One hour only.

Ops

Limited injection

1800-2100

Check sextupole optional cycling in magnet conditioning. No beam

Emery

No beam

1800-2100

PAR high charge

Mohsen

No beam

2100-2300

Continue DAQ TBT measurements yo resolve turn synchronization problem

Sajaev Emery

Stored beam & injection

2300-0200

Gas scattering lifetime 200 mA various bunch patterns II

Emery

Stored beam & injection


Tuesday June 23, 2026



0200-0400

Injector training (18-06)

Ops

Limited Injection

0400-0600

SR set up

Dick

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection