Machine Studies
Draft Schedule for Run02-6, 2026
July 13 0800 – July 15 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 13, 2026 |
|
|
0800-0900 |
Reset transverse feedback amplifier #4 |
Weghorn |
No Beam |
0800-1200 |
LB+ autosave study/FOK scope adjustment |
Grass |
No Beam |
0800-1200 |
Booster Direct RF FB testing |
Berenc |
No Injection |
0830-0900 |
L5:AS1 measurement |
Yawei |
No Injection K5 off |
0830-0930 |
Swap unipolar PS S33 cabinet 5 |
PS group |
No Beam |
0900-1000 |
Inspect I:S1 |
Wright/Puttkammer |
Access Zone F |
0900-1100 |
Reboot sioc2iramp and xbpm iocs |
Shifu |
No Beam |
0900-1100 |
Reboot S36 soft iocs/adjust S36 drain voltage |
DiMonte/RF group |
No Beam |
0900-1100 |
Install DC bus voltage monitor S40 |
Vargas |
No Beam |
0930-1130 |
Laser alignment |
Dooling |
Access Linac |
|
|
|
|
1030-1200 |
Adjust S35DSID limit switch |
Donnelly |
Access Zone E |
1000-1200 |
Test S10 bipolar PS firmware |
Kreps |
No Beam |
1000-1200 |
Use PCB coils for magnet measurement |
Wei |
No Beam |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 hours |
Injector training (08-18) |
Ops |
Limited Injection |
2 hours |
Injector training (18-06) |
Ops |
Limited Injection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tuesday, July 14, 2026 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 hours |
Injector training (18-06) |
Ops |
Limited Injection |
|
|
|
|
|
|
|
|
|
Wednesday July 15, 2026 |
|
|
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam and injection |
|
|
|
|