Machine Studies

Draft Schedule for Run02-6, 2026

July 13 0800 – July 15 0800



Time

Descriptions

Studiers

SR Status


Monday, July 13, 2026



0800-0900

Reset transverse feedback amplifier #4

Weghorn

No Beam

0800-1200

LB+ autosave study/FOK scope adjustment

Grass

No Beam

0800-1200

Booster Direct RF FB testing

Berenc

No Injection

0830-0900

L5:AS1 measurement

Yawei

No Injection K5 off

0830-0930

Swap unipolar PS S33 cabinet 5

PS group

No Beam

0900-1000

Inspect I:S1

Wright/Puttkammer

Access Zone F

0900-1100

Reboot sioc2iramp and xbpm iocs

Shifu

No Beam

0900-1100

Reboot S36 soft iocs/adjust S36 drain voltage

DiMonte/RF group

No Beam

0900-1100

Install DC bus voltage monitor S40

Vargas

No Beam

0930-1130

Laser alignment

Dooling

Access Linac





1030-1200

Adjust S35DSID limit switch

Donnelly

Access Zone E

1000-1200

Test S10 bipolar PS firmware

Kreps

No Beam

1000-1200

Use PCB coils for magnet measurement

Wei

No Beam





































2 hours

Injector training (08-18)

Ops

Limited Injection

2 hours

Injector training (18-06)

Ops

Limited Injection


















Tuesday, July 14, 2026















2 hours

Injector training (18-06)

Ops

Limited Injection










Wednesday July 15, 2026



0600-0800

Injector training/prepare for user beam

Ops

Stored beam

and injection