Machine Studies
Draft Schedule for Run02-7, 2026
July 13 0800 – July 15 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 13, 2025 |
|
|
0800-0900 |
Orbit Response |
Dick |
Stored Beam and Injection |
0900-1000 |
Reset transverse feedback amplifier #4 |
Weghorn |
No Beam |
0900-1300 |
LB+ autosave study/FOK scope adjustment |
Grass |
No Beam |
0800-1300 |
Booster Direct RF FB testing |
Berenc |
No Injection |
0830-1000 |
L5:AS1 measurement |
Yawei |
No Injection K5 off |
0930-1030 |
Swap unipolar PS S33 cabinet 5 |
PS group |
No Beam |
1000-1100 |
Inspect I:S1 |
Wright/Puttkammer |
Access Zone F |
1000-1100 |
S40C4 blower replacement |
MOM group |
Access Zone F |
1000-1100 |
Switch linac timing from 119 MHz to 136 MHz (lasting ~ 28 hours) |
Hong |
Access Zone F |
1000-1200 |
Reboot sioc2iramp and xbpm iocs |
Shifu |
No Beam |
1000-1200 |
Reboot S36 soft iocs/adjust S36 drain voltage |
DiMonte/RF group |
No Beam |
1000-1200 |
Install DC bus voltage monitor S40 |
Vargas |
No Beam |
1030-1230 |
Laser alignment |
Dooling |
Access Linac |
|
|
|
|
1130-1300 |
Adjust S35DSID limit switch |
Donnelly |
Access Zone E |
1100-1300 |
Test S10 bipolar PS firmware |
Kreps |
No Beam |
1100-1300 |
Use PCB coils for magnet measurement |
Wei |
No Beam |
1200-1600 |
RG1 last-chance optimization |
Sun |
No Beam |
1300-1400 |
Recover BTS and SR magnets |
Ops |
Stored Beam and Injection |
1600-1800 |
Operator training |
Ops |
Stored Beam and Injection |
1800-2400 |
booster high charge |
Calvey Mohsen |
Stored Beam and Limited Injection |
2330-2400 |
SR 48 bunch 130 mA check with BLS tuned for 130 mA |
Emery |
Stored Beam and Limited Injection |
|
Tuesday, July 14, 2025 |
|
|
0000-0300 |
Q1/Q2 hysteresis. 10 mA. |
Chenran |
Stored Beam and Injection |
0300-0700 |
FOFB for testing 60 Hz suppression with 3 local systems. Can continue with decaying beam |
Carwardine |
Stored Beam and Injection |
|
PC gun |
|
|
0700-0730 |
Switch from RG2 to PC gun |
Hong |
No Beam |
0730-1030 |
PC gun tests with 136 MHz |
Sun Piot |
No Beam |
1030-1100 |
PC gun switch to RG2 with 136 MHz |
Hong |
No Beam |
|
LEA shielding |
|
|
1100-1200 |
LEA Beam Loss I |
Wootton, HP |
No Beam |
1200-1300 |
Access LEA for shielding change |
Wootton, HP |
|
1300-1400 |
LEA Beam Loss II |
Wootton, HP |
No Beam |
1400-1430 |
Switch linac timing from 136 MHz to 119 MHz |
Hong |
No Beam |
1430-1630 |
BTS quad offset |
Chenran Puttkammer |
Stored Beam and Injection |
1630-1930 |
Turn-by-turn phase advance measurements for optics. Single bunch, TDP mode. |
Sajaev |
Stored Beam and Injection |
1930-2100 |
Operator training |
Ops |
Stored Beam and Injection |
2100-2400 |
low-beta lattice correction (flexible ending time) |
Borland Sajaev Emery |
Stored Beam and Injection |
|
Wednesday, July 15, 2025 |
|
|
0000-0300 |
More setup in general for 48 bunches: 1. Reduce IK setpoints with BTS trajectory and S:IS1 setpoints. 2. Check BLS “quenches” or instabilities during decay. 3. FF table for BLS tuning |
Emery Dick |
Stored beam & injection |
0400-0600 |
Set up SR for 48 bunch operations + orbit response and chromaticity measurements |
Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |