Machine Studies

Draft Schedule for Run02-9, 2026

September 14 0800 – September 16 0800



Time

Descriptions

Studiers

SR Status


Monday, September 14, 2026



0800-0815

Check LFB limits with 200 mA bunch pattern left from user time

Kallakuri

Stored Beam and Injection

0815-0900

SR orbit response

Dick

Stored Beam and Injection

0900-1100

Laser alignment install virtual cathode

Dooling

Access Linac

0900-1100

BIS control board maintenance

Vargas

No Injection

0900-1100

Measure Bx & By magnet switching time

Abid

No Injection

0900-1100

PCB coil measurements S1 & 2

Wei

No Beam

0900-1200

SR RF Presence Detector Measurements

Berenc

No Beam/RF on

1200-1300

Update M1/M2 firmware

Ruan

No Beam

1200-1300

Update liberaBplus BPM ioc

Grass

No Beam

1200-1300

Prepare for accesses

Ops/HP/FAC

No Beam

1300-1500

Laser scans of BLS cryostat

Downey

Access Zone F

1500-1600

MAC committee tour

Sajaev

Access Zone F

1600-1800

SR recovery

Ops

Stored Beam and Injection

1800-2000

Operator training

Ops

Stored Beam and Injection

2000-2400

LFB grow-damp measurements

Kallakuri

Stored Beam and Injection


Tuesday, September 15, 2026



0000-0100

S03-FOFB data for model development

Kallakuri

Stored Beam and Injection

0100-0400

Open


Stored Beam and Injection

0400-0800

Open


Stored Beam and Injection

0800-1200

Beam Loss Measurement with AC Excitation.

Cheng

Stored Beam and Injection

1200-1600

RG1 study

Y. Sun

Stored Beam and Injection

1600-2000

Operator trainings (day and night shifts)

Ops

Stored Beam and Injection

2000-2400

SR magnet conditioning studies

Emery

Stored Beam and Injection


Wednesday, September 16, 2026



0000-0400

SR efficiency versus septum bump

Emery

Stored beam & injection

0400-0600

SR orbit response and chromaticity measurements

Dick

Stored beam & injectionRun26.2.

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection