Draft Schedule for Run03-3, 2026
September 21 0800 – September 22 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, September 21, 2025 |
|
|
0800-0900 |
Response matrix measurement |
Dick |
Stored beam & injection |
0900-1150 |
PC gun to the linac (no PAR) |
Y. Sun et al |
No Beam |
0900-1150 |
Test SR pulsers and PAR kicker waveform monitor |
Paskvan |
No Beam |
1000-1100 |
Propagate VLAN |
Westbrook |
Limited Injection |
0900-1100 |
Test BLS back up heater |
Fuerst |
No Beam |
|
|
|
|
1150-1200 |
Test MPS ioc reboot with 12 mA |
Smith |
Stored beam & injection |
1200-1300 |
Test SR steering software – leave beam in ring |
Shang |
Stored beam & injection |
1300-1600 |
Booster High Charge |
Calvey Mohsen
|
Stored beam & Limited injection |
1600--1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2000 |
Injector training |
Ops |
Stored beam & injection |
2000-2200 |
Measure some SR bpms offsets. Check some local orbit perturbations |
Emery Dick |
Stored beam & injection |
2200-0200 |
Optics check of various SR magnet conditioning order |
Emery |
Stored beam & injection |
|
Tuesday September 22, 2025 |
|
|
0200-0400 |
Open |
|
Stored beam & injection |
0400-0600 |
SR set up |
Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |