Draft Schedule for Run03-3, 2026

September 21 0800 – September 22 0800



Time

Descriptions

Studiers

SR Status


Monday, September 21, 2025



0800-0900

Response matrix measurement

Dick

Stored beam & injection

0900-1150

PC gun to the linac (no PAR)

Y. Sun et al

No Beam

0900-1150

Test SR pulsers and PAR kicker waveform monitor

Paskvan

No Beam

1000-1100

Propagate VLAN

Westbrook

Limited Injection

0900-1100

Test BLS back up heater

Fuerst

No Beam





1150-1200

Test MPS ioc reboot with 12 mA

Smith

Stored beam & injection

1200-1300

Test SR steering software – leave beam in ring

Shang

Stored beam & injection

1300-1600

Booster High Charge

Calvey Mohsen


Stored beam & Limited injection

1600--1800

Operator training

Ops

Stored beam & injection

1800-2000

Injector training

Ops

Stored beam & injection

2000-2200

Measure some SR bpms offsets. Check some local orbit perturbations

Emery Dick

Stored beam & injection

2200-0200

Optics check of various SR magnet conditioning order

Emery

Stored beam & injection


Tuesday September 22, 2025



0200-0400

Open


Stored beam & injection

0400-0600

SR set up

Dick

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection