Machine Studies
Draft Schedule for Run03-5, 2026
October 5 0800 – October 6 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 5, 2026 |
|
|
0800-0900 |
Response matrix measurement |
Dick |
Stored beam & injection |
0820-0900 |
Linac, LPL, Booster setup. SR only needs turns counter. Other RF ramping. |
Yine, Osama, Joe |
No Beam |
0900-0930 |
Linac tuning 425 MeV |
Yine |
No Beam |
0930-0945 |
PAR tuning 425 MeV |
Mohsen |
No Beam |
0945-1000 |
Booster setup 425 MeV |
Calvey |
No Beam |
1000-1200 |
PAR kicker waveform monitoring |
Paskvan |
Limited Injection |
0900-1100 |
Investigate S10 PS controller noise |
Kreps |
No Beam |
1000-1300 |
Booster console testing |
Lawson/Fystro |
Limited Injection |
1300-1400 |
Install microphone from utility corridor and record septum acoustic data. We can only start after the above console test is finished. |
Suthar |
No Beam. |
1315-1400 |
ITS work |
Popovic |
Access ITS |
1400-1430 |
Recover linac |
Ops |
No Beam. |
1430-1600 |
S29-FOFB studies with IEX |
Carwardine |
Stored beam & injection |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1800-2200 |
Booster digital LLRF feedback with beam |
Calvey Berenc Mohsen |
Stored beam & injection |
2200-2400 |
Injector training |
Ops |
Stored beam & injection |
|
Tuesday October 6, 2026 |
|
|
0000-0200 |
Check of BLS operation 48 bunches decay |
Emery |
Stored beam & injection |
0200-0400 |
Conditioning tests with orbit response measurements and possible optics correction |
Dick Emery |
Stored beam & injection |
0400-0600 |
SR set up |
Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |