Machine Studies

Draft Schedule for Run03-6, 2026

October 12 0800 – October 14 0800



Time

Descriptions

Studiers

SR Status


Monday, October 12, 2025



0800-0900

Orbit Response

Dick

Stored Beam and Injection

0830-0900

switch linac rf to async

Hong (?)

Stored Beam and No Injection

0900-0930

Replace K5 chassis. K5 down.

Yawei

No beam

0900-1100

Investigate 15ID photon shutter

Clute

Zone B, AA

0900-1200

K4 troubleshooting. Results determines which of the blue or red highlighted studies are done

Meyer

No beam

0900-1200

Setup for Mode-0 correction with S37-FOFB  controller. No beam

Kallakuri, Carwardine

No beam

0900-1200

PCG beam to L3

Y Sun

No beam

1200-1300

Restore linac timing; Energy switch to 425 MeV in all injector machines

Y. Sun, Mohsen, Calvey

No beam

1200-1500

Energy switch to 300 MeV in all injector machines

Y. Sun, Mohsen, Calvey

No beam

1300-1500

Test the new pvgroup/steering application

Shang, E. Chandler

Stored Beam and Injection

1500-1700

Test the new pvgroup/steering application

Shang, E. Chandler

Stored Beam and Injection

1600-1800

Operator training. See above status for options in start time

Ops

Stored Beam and Injection

1800-2200

XBPM study in S04

W. Li

Stored Beam and Injection

2200-2400

Re-measure the BLS voltage FF table for beam decay with 48 bunches 130 mA

Emery

Stored Beam and No Injection

2200-2400

Open




Tuesday, October 13, 2025



0000-0200

Operator training

Ops

Stored Beam and Injection

0200-0600

Open


Stored Beam and Injection

0600-0700

Open


Stored Beam and Injection

0700-0930

Linac console testing

Basiorka/Fystro

Limited Injection

1000-1130

Laser alignment

Dooling

Access Linac

1130-1500

RF Gun Survey & alignment

Waldschmidt/Survey

Access Linac

1500-1800

Orbit-to-RF phase feedback algorithm for CBM0 correction. 15 mA and higher.

Kallakuri, Carwardine

Stored Beam and Injection

1800-2000

Operator training

Ops

Stored Beam and Injection

2000-2400

PC gun in linac

C. Xu

Stored Beam and No Injection


Wednesday, October 14, 2025



0000-0400

PC gun in linac (cont’d)

C. Xu

Stored beam & No injection

0400-0600

Set up SR + orbit response and chromaticity measurements

Dick

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection