Machine Studies /Intervention
Schedule for Run 1998-5-8
December 8th 1998, 0800 -- December 8th, 1998 1600
Time
|
Tuesday, December 8th, 1998
|
Studiers
|
0800-0845
|
RF setup for singlets
|
Nassiri, Harkay
|
0845-0900
|
S36C1 adjustements
|
Nassiri
|
0900-1000
|
Singlets scrape down
|
Decker
|
1000-1130
|
Effects of SCDU triggering on the injection scan method. (10-20 mA fills)
|
Lill
|
1130
|
Fill: 10mA in 6, maintained until 1430 for parasitic chopper studies.
|
Borland
|
1130-1200
|
LINAC ACIS-related tests.
No injection during this time.
|
Lewellen
et. al.
|
1130-1330
|
Measurement of small-gap bpm offsets with RT feedback system using 1130 fill pattern.
|
Carwardine
|
1330-1530
|
Bunch purity. Beam may be dumped and refilled in arbitrary pattern at 1430.
|
Sereno
|
1530-1600
|
Prepare beam for user operations
|
Ops
|