Machine Studies

Schedule for Run 1999

October 29, 0800 to November 4, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Friday, 10/29/1999

 

 

0800-1200

Tuning DI water temperature control

Swetin

No beam
No injection

0800-1000

Re-configure iocs35, 37 and 39 vp

Gunderson

No beam
No injection

0800-1000

SR injection septum current readback test

Hillman

No injection

0800-1200

linac MV20 system test

Arnold

Linac beam
only

1200-2000

Verify subsystem function and Restore SR operation

Yao

Stored beam
and injection

2000-2200

Re-commission Mono-pulse receivers

Decker
Lill

Stored beam
and injection

2200-2400

BPLD validation and re-measurement of P1 BPM offsets

Decker
Pietryla

Stored beam
and Injection

 

Saturday, 10/30/1999

 

 

0000-0400

Continue BPLD validation and re-measurement of P1 BPM offsets

Decker
Pietryla

Stored beam
and Injection

0400-0600

Feedback start-up test

Carwardine

Stored beam
and Injection

0600-1000

SR septum orbit transient feed-forward software test

Carwardine

Stored beam
and Injection

1000-1200

S35 BM camera operation verification

Lumpkin
Yang

Stored beam
and Injection

1200-1600

Storage ring damping time measurement with RF frequency scan

Yang
Borland

Stored beam
and injection

1600-2000

Re-timing the kickers to minimize the stored beam betatron oscillations

Emery

Stored beam
and Injection

2000-2400

Install betay-corrected lattice

Emery

Stored beam
and Injection

 

Sunday, 10/31/1999

 

 

0000-0400

(5 hours)

Available

 

 

0400-0800

Single bunch instability baseline measurement

Harkay
Lessner

Stored beam
and injection

0800-1200

Bunch length and energy spread measurement with streak camera, shutter support needed

Harkay
Lessner
Yang

Stored beam
and injection

1200-1600

Electron cloud study

Harkay
Rosenberg

Stored beam
and injection

1600-2000

Booster running at low frequency

Yao

Stored beam
and injection

2000-2200

S35 BM/ID and S36 AM source point beta function measurement.

Yao

Stored beam
and Injection

2200-2400

BPM beam scrape-down training

Singh
Lester
Lill

Stored beam
and injection

 

Monday, 11/01/1999

 

 

0000-0200

BPM beam scrape-down training

Singh
Lester
Lill

Stored beam
and injection

0200-0600

Mono-pulse receiver training

Singh
Lester
Lill

Stored beam
and injection

0600-1200

DC mode of Booster dipole supplies

Wang

Puttkam

Stored beam
only.

1000-1200

SR Xfer matrice measurement

Carwardine

Stored beam
only.

0600-1200

Beam-based linac timing jitter measurement

Lewellen
Travish

No injection

1200-1600

Commission septum orbit transient feed-forward

Carwardine

Stored beam
and Injection

1600-2400

Linac to Booster injection commissioning

Sereno
Lenkszus

No injection

1600-2400

Tuning SR DI water temperature control

Swetin

No injection

 

Tuesday, 11/02/1999

 

 

0000-0800

S3 and S14 P0 response calibration, DBPLD commissioning

Decker
Singh

Stored beam
and injection

0800-1200

BPM thermal effects studies

Emery
Dortwegt

Stored beam
and injection

1200-1600

Check radiation level during refill with shutters open. Shutter support needed

Emery

Stored beam
and injection

1600-2400

Establish user orbit and BPM studies

Decker

Singh

re-injection possible

1600-2400

Thermionic RF gun#2 beam test

Lumpki
Sereno

No injection

 

Wednesday, 11/03/1999

 

 

0000-0400

Test orbit feedback with small matrix terms zeroed out

Carwardine
Lenkszus

Stored beam
and injection

0400-0800

Measurement of corrector dynamic performance

Carwardine

Stored beam
and injection

0800-1000

BPM scrape down, Check/commission S7A:P0

Singh

Stored beam
and injection

1000-1800

Top-up studies with SRI CAT users, shutter support needed

Emery
SRI CAT

Stored beam
and injection

1800-2100

Performance test for PV gateway

Borland

Stored beam only

1800-2400

Booster bunch cleaning experiment

Sereno

No injection

2100-2400

Available time.

 

Stored beam only

 

Thursday, 11/04/1999

 

 

0000-0200

Continue booster bunch cleaning experiment

Sereno

No injection

0200-0600

BPM thermal effect data collection

Ops
Yao

Stored beam
and injection

0600-0800

Operator training, ready for User operations

Ops
Yao

Stored beam
and injection