Machine Studies

Schedule for Run 1999

November 9, 0800 to November 9, 1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 11/09/1999

 

 

0800-0900

Adjust the new couplers installed for parallel operations

Nassiri

No beam

0800-0900

Finalize the RF4 orphan load solenoid valve interlock system located at RF1

Horan

No beam

0800-0900

replace S16A:V3

PS group

No beam

0800-1100

replace process water system controller for sectors 29/30

Swetin

No beam

1000-1100

study the RF4 phase loop jump problem

Horan

No beam

1100-1500

Miscellaneous bpm repairs and studies

Decker

Lester

Lill

Singh

Stored beam and injection

(parasitic)

1200-1400

Shielding verification of 4-ID-A

Mohan

4-ID-A User

Stored beam and injection

1100-1400

Steering studies

Emery

Stored beam and injection

(parasitic)

1400-1530

Kicker scan and SR injection studies

Emery

Stored beam

and injection

 

1530-1600

Ready for User beam

Ops

Yao

Stored beam and injection