Machine Studies

Schedule for Run5-5, 1999

Nov 29, 0800-Dec 1, 0800

 

Time

Descriptions

Studiers

SRStatus

 

Monday, 11/29/99

 

 

0800-0900

Replace S3A:S3 converter and GesADC

Carwardine

PS

No injection

0800-0900

Access Zone-A to repair 4ID gap

Mohan

No injection

0800-1000

intall/test modification to S38A:H3 and S39A:H3 (Tuesday, day time)

Carwardine

PS

No injection

0800-1000

Par RF phase test

T. Smith

No injection

1000-1400

DBPLD studies

Singh

Pietryla

Stored beam and injection

1200-2000

Linac RF investigation an diagnostics checkout.

Lewellen

SR Injection possible

1400-1600

14 BM Xbpm study

singh

Stored beam and injection

1600-2000

Feedforward studies with ID gaps open/close

Emery

 

Stored beam and injection

2000-2400

BPM top-up studies

Decker

Erwin

Stored beam and injection

 

Tuesday, 11/30/99

 

 

0000-0200

BPM top-up studies

Decker

Erwin

Stored beam and injection

0200-0800

Parallel operations of RF system

Nassiri

Horan

No injection

0800-0900

BPM studies

Singh

Stored beam and injection

0900-1300

Top-up studies with SRI shutters open

SRI

Emery

Stored beam and injection

1300-1500

Re-test septum feed-forward with modified correctors

Carwardine

Emery

Stored beam and injection

1500-1900

Orbit feed-forward studies

Carwardine

 

Stored beam and injection

1900-2300

 

Single bunch instability studies

Harkay

Lessner

Stored beam and injection

2300-2400

Thermal transient from 15 mA to 100 mA

Emery

Stored beam and injection

 

Wednesday, 12/01/99

 

 

0000-0100

Thermal transient from 15 mA to 100 mA

Emery

Stored beam and injection

0100-0300

Orbit correction transient reduction

Emery

Stored beam and injection

0300-0500

SR injection efficiency studies, tune measurement

Emery

Stored beam and injection

0400-0600

Setup scrapers for top-up injection. Needs 6ID shutters open.

Emery

Stored beam and injection

0700-0800

Ready for user beam

Ops

Yao

Stored beam and injection