Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Monday, 11/29/99
|
|
|
0800-0900
|
Replace S3A:S3 converter and GesADC
|
Carwardine
PS
|
No injection
|
0800-0900
|
Access Zone-A to repair 4ID gap
|
Mohan
|
No injection
|
0800-1000
|
intall/test modification to S38A:H3 and S39A:H3 (Tuesday, day time)
|
Carwardine
PS
|
No injection
|
0800-1000
|
Par RF phase test
|
T. Smith
|
No injection
|
1000-1400
|
DBPLD studies
|
Singh
Pietryla
|
Stored beam and injection
|
1200-2000
|
Linac RF investigation an diagnostics checkout.
|
Lewellen
|
SR Injection possible
|
1400-1600
|
14 BM Xbpm study
|
singh
|
Stored beam and injection
|
1600-2000
|
Feedforward studies with ID gaps open/close
|
Emery
|
Stored beam and injection
|
2000-2400
|
BPM top-up studies
|
Decker
Erwin
|
Stored beam and injection
|
|
Tuesday, 11/30/99
|
|
|
0000-0200
|
BPM top-up studies
|
Decker
Erwin
|
Stored beam and injection
|
0200-0800
|
Parallel operations of RF system
|
Nassiri
Horan
|
No injection
|
0800-0900
|
BPM studies
|
Singh
|
Stored beam and injection
|
0900-1300
|
Top-up studies with SRI shutters open
|
SRI
Emery
|
Stored beam and injection
|
1300-1500
|
Re-test septum feed-forward with modified correctors
|
Carwardine
Emery
|
Stored beam and injection
|
1500-1900
|
Orbit feed-forward studies
|
Carwardine
|
Stored beam and injection
|
1900-2300
|
Single bunch instability studies
|
Harkay
Lessner
|
Stored beam and injection
|
2300-2400
|
Thermal transient from 15 mA to 100 mA
|
Emery
|
Stored beam and injection
|
|
Wednesday, 12/01/99
|
|
|
0000-0100
|
Thermal transient from 15 mA to 100 mA
|
Emery
|
Stored beam and injection
|
0100-0300
|
Orbit correction transient reduction
|
Emery
|
Stored beam and injection
|
0300-0500
|
SR injection efficiency studies, tune measurement
|
Emery
|
Stored beam and injection
|
0400-0600
|
Setup scrapers for top-up injection. Needs 6ID shutters open.
|
Emery
|
Stored beam and injection
|
0700-0800
|
Ready for user beam
|
Ops
Yao
|
Stored beam and injection
|