Machine Studies

Schedule for Run5-6, 1999

Dec. 7, 0800-1600

 

Time

Descriptions

Studiers

SRStatus

 

Tuesday, 12/07/99

 

 

0800-0830

EPS maintenance work on ID 32

Friedman

No beam

0800-1000

Access to linac tunnel

Biggs

Kelly

No injection

0800-0900

Replace S29A:H2 ADC control card and S3A:S3 interface board

Carwardine

PS

No beam

0800-0900

Replace ares RF radiation monitors at RF1 Circulator, Corridor, S37 Mezz, and S38 Mezz.

Horan

No beam

0800-0900

Reboot various SR iocs

Gunderson

No beam

0800-1000

Measure current output of booster dipole ramping supply

Banks

PS

No injection

0800-0900

Modify SR bpm and RTFB ioc database

Lenkszus

No beam

1000-1200

Optimize the corrector Feed-forward coefficients and testing after

Emery

Stored beam and injection

1200-1400

Reduce orbit correction transient

Emery

Stored beam and injection

1400-1530

Injection studies, no shutter support required

Emery

Stored beam and injection

1530-1600

Ready for User beam

Ops

Stored beam and injection