Time
|
Descriptions
|
Studiers
|
SRStatus
|
|
Tuesday, 12/07/99
|
|
|
0800-0830
|
EPS maintenance work on ID 32
|
Friedman
|
No beam
|
0800-1000
|
Access to linac tunnel
|
Biggs
Kelly
|
No injection
|
0800-0900
|
Replace S29A:H2 ADC control card and S3A:S3 interface board
|
Carwardine
PS
|
No beam
|
0800-0900
|
Replace ares RF radiation monitors at RF1 Circulator, Corridor, S37 Mezz, and S38 Mezz.
|
Horan
|
No beam
|
0800-0900
|
Reboot various SR iocs
|
Gunderson
|
No beam
|
0800-1000
|
Measure current output of booster dipole ramping supply
|
Banks
PS
|
No injection
|
0800-0900
|
Modify SR bpm and RTFB ioc database
|
Lenkszus
|
No beam
|
1000-1200
|
Optimize the corrector Feed-forward coefficients and testing after
|
Emery
|
Stored beam and injection
|
1200-1400
|
Reduce orbit correction transient
|
Emery
|
Stored beam and injection
|
1400-1530
|
Injection studies, no shutter support required
|
Emery
|
Stored beam and injection
|
1530-1600
|
Ready for User beam
|
Ops
|
Stored beam and injection
|
|
|
|
|