| Injector Studies Schedule | |||
| Thursday, January 4 – TBD | |||
| Thursday, January 04 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-13:00 | New Linac RF source patch panel installation | Yawei Yang | |
| 13:00-15:00 | Recover and tune-up Linac | MCR | |
| 15:00-17:00 | Operator training | MCR | |
| 17:00-24:00 | PAR scrubbing | MCR | |
| Friday, January 05 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-13:00 | Booster Controlled Access system validation | Shoaf, MCR | |
| 13:00-17:00 | Set up PAR for scrubbing with HarmRF and FF | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, January 06 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, January 07 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, January 08 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | RG1 kicker validation application checkout | Fystro | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, January 09 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | PAR HP surveys with beam to PTB stop | Mike Henry, Harkay | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, January 10 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00 AM | UPS-INJ A and Central UPS INJ A replacement begins | Doktorczyk | |
| 07:00-09:00 | Booster tunnel pre-closure checkouts | ||
| 10:00-15:00 | Booster tunnel closure | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, January 11 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-17:00 | 352 MHz waveguide air PSS system calibration | RF Group | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, January 12 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | Lab closed |
| 09:00-17:00 | PAR scrubbing | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, January 13 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, January 14 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, January 15 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | Lab holiday |
| 09:00-17:00 | PAR scrubbing | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, January 16 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-15:00 | Booster dipole start/troubleshooting | PS Group | |
| 09:00-15:00 | Troubleshoot 9.77 MHz source dropouts | RF Group | |
| 09:00-15:00 | RF5 start-up and ACIS shutdown validation | RF Group | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, January 17 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-10:00 | Prepare for UPS shutdown | MCR | all Linac and PAR RF down |
| 07:00-17:00 | RF5 checkout/conditioning | RF Group | |
| 10:00-12:00 | Operator training | MCR | |
| 12:00-15:00 | Booster dipole start/troubleshooting | PS Group | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, January 18 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-09:00 | Booster dipole start/troubleshooting | PS Group | |
| 09:00-10:00 | Booster dipole ACIS shutdown validation | PS Group/MCR | |
| 10:00-24:00 | Booster magnet power supply checkout | PS Group | |
| 10:00-24:00 | Booster RF conditioning | RF Group | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, January 19 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | |||
| 09:00-17:00 | |||
| 15:00-17:00 | |||
| 17:00-19:00 | Operator training | MCR | |
| 17:00-24:00 | |||
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, January 20 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, January 21 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, January 22 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-15:00 | Switch K2 to all digital readbacks | Yawei Yang, Grass Wang, Nick DiMonte, Greg Fystro | |
| 09:00-10:00 | Replace directional coupler in Linac source rack | Yawei Yang | All Linac RF systems off |
| 15:00-21:00 | Linac studies | Lobach, Mohsen | |
| 16:00-17:00 | Replace 352 MHz source for PAR | Berenc | |
| 21:00-23:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, January 23 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-17:00 | PAR scrubbing | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, January 24 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-17:00 | Test RG1 kicker validation script | Fystro | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, January 25 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-13:00 | K4 LLRF investigation/troubleshooting | Yawei Yang | |
| 13:00-17:00 | PAR scrubbing | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, January 26 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-12:00 | PAR scrubbing | MCR | |
| 12:00-17:00 | Linac ML studies | Kuklev, Mohsen | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, January 27 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, January 28 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, January 29 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 06:00-08:00 | Shut down Booster power supplies | Puttkammer | |
| 07:00-09:00 | Operator training | MCR | |
| 08:00-14:00 | Building 420 emergency power shutdown | Markovich | |
| 13:00-15:00 | PAR training | Harkay, Yine Sun, Mohsen | |
| 14:00-15:00 | Recover Booster power supplies | Puttkammer | |
| 15:00-19:00 | Linac ML studies | Kuklev, Yine Sun, Lobach, Mohsen | |
| 19:00-21:00 | Operator training | MCR | |
| 21:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, January 30 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | BEFI validation | Sereno | requires Booster dipole on, EK off |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, January 31 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-11:00 | Linac console test | MCR | |
| 19:00-17:00 | BEFI validation | Sereno | requires Booster dipole on, EK off |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, February 01 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-10:00 | Prepare for Booster access | MCR | |
| 10:00-11:00 | Booster access for RSS tag replacement | Vanwingeren | |
| 11:00-12:00 | Recover Booster | MCR | |
| 12:00-17:00 | BEFI validation | Sereno | requires Booster dipole on, EK off |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, February 02 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-09:00 | Reboot iocinjtime, iocmtime, and IETS and switch master oscillator reference | Fors | No IETS triggers, no PAR extraction |
| 09:00-17:00 | BEFI validation | Sereno | requires Booster dipole on, EK off |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, February 03 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, February 04 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, February 05 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | Prepare for Booster beam | MCR | |
| 15:00-17:00 | |||
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, February 06 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-11:00 | Troubleshoot Booster tune measurement RF | Fors | No beam, PAR RF off |
| 09:00-15:00 | BEFI validation | Sereno | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, February 07 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-17:00 | BEFI validation | Sereno | |
| 12:00-14:00 | Switch PAR to IETS | Fors | PAR RF off |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, February 08 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | BEFI validation | Sereno | |
| 15:00-16:00 | Operator training | MCR | |
| 17:00-24:00 | Booster beam studies | Calvey | Zone F tunnel search requires HP approval |
| Friday, February 09 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | BEFI validation | Sereno | |
| 15:00-17:00 | Operator training | MCR | |
| 17:00-24:00 | PAR scrubbing | MCR | |
| Saturday, February 10 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, February 11 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, February 12 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-08:00 | Prepare for Linac/PAR access | MCR | |
| 08:00-11:00 | Install replacement preamp at K4 | Yawei Yang | |
| 08:00-15:00 | BEFI validation | Sereno | |
| 08:00-08:30 | Linac/PAR access to remove LOTO for stops | MCR/SI/MOM | |
| 08:30-11:00 | Linac/PAR access to prepare for gamma probe install | Harkay | |
| 11:00-12:00 | Test new preamp at K4 | Yawei Yang | |
| 11:00-12:00 | Recover Linac/PAR | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 15:00-17:00 | Operator training | MCR | |
| 17:00-24:00 | Booster beam studies | Calvey | Zone F tunnel search requires HP approval |
| Tuesday, February 13 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-10:00 | Linac modulator pump filter replacement | Wright | All Linac RF systems off |
| 10:00-17:00 | BEFI validation | Sereno | |
| 15:00-17:00 | Operator training | MCR | |
| 17:00-24:00 | Booster beam studies | Calvey | Zone F tunnel search requires HP approval |
| Wednesday, February 14 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-10:00 | Operator testing | MCR | |
| 09:00-15:00 | PAR scrubbing | MCR | |
| 15:00-16:00 | Reconfigure IETS | Fors | all Linac, PAR, and Booster RF down |
| 15:00-17:00 | Operator training | MCR | |
| 17:00-24:00 | Booster beam studies | Calvey | Zone F tunnel search requires HP approval |
| Thursday, February 15 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-13:00 | BEFI validation | Sereno | |
| 14:00-15:00 | Prepare Booster tunnel, rack out and HP survey | Bring to AA Doors locked | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, February 16 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-15:00 | Pull ion pump cables for BTS | Meade Electric | |
| 07:00-17:00 | 420 RF system PSS air calibration | RF Group | No 420 RF systems may be turned on until the completion of this work. |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, February 17 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, February 18 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, February 19 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-15:00 | Pull fiber along BTS from Booster to SR | Dooling | |
| 07:00-17:00 | 420 RF system PSS air calibration | RF Group | No 420 RF systems may be turned on until the completion of this work. |
| 08:00-14:00 | Vent, connect, pump down, and leak check near HET stop | Clute, et. al. | |
| 09:00-09:30 | Bring down all injector RF systems | MCR | |
| 09:30-10:30 | Reboot of IETS system | Fors | all Linac, PAR, and Booster RF down |
| 11:00-15:00 | Iocinjtime reboots | Ran Hong, Fors, MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | Linac L3 trajectory tune-up | Lobach | |
| Tuesday, February 20 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-17:00 | Vacuum leak checking of BTS inside Booster | Clute, et. al. | |
| 08:00:00 AM | ICR-UPS-B work to begin | Doktorczyk | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Wednesday, February 21 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 07:00-08:00 | Booster tunnel search and closure | MCR | |
| 08:00-09:00 | Booster recovery | MCR | RF5 remains off, only need dipole and BEK on |
| 09:00-17:00 | BEFI validation | Sereno | |
| 10:00-12:00 | Address IETS reboot P0 alignment | Fors, DiMonte, et. al. | Needs beam to PTB stop |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, February 22 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-13:00 | Operator qualification testing | MCR | |
| 13:00-17:00 | Open | ||
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Friday, February 23 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-09:00 | Operator training | MCR | |
| 09:00-15:00 | |||
| 15:00-17:00 | |||
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Saturday, February 24 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Sunday, February 25 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-12:00 | PAR scrubbing | MCR | |
| 12:00-14:00 | Operator training | MCR | |
| 14:00-24:00 | PAR scrubbing | MCR | |
| Monday, February 26 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-08:00 | Prepare for Booster access | MCR | Alternate LOTO for BTS quads |
| 07:00-16:00 | RF systems maintenance | RF Group | Bring down all of Linac/PAR |
| 08:00-10:00 | Booster access for BTS:FS2 investigation | Erwin | All LOTO locks overlocked |
| 10:00-12:00 | Booster access for BTS quads testing | Jordan, Puttkammer | Coordinate HET quads LOTO |
| 11:00-11:30 | K2 RF ACIS shutdown validation | MCR, Yawei Yang | K2 LLRF ACIS interface replacement |
| 12:00-13:00 | Recover from Booster access | MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Tuesday, February 27 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-16:00 | RF systems maintenance | RF Group | Bring down all of Linac/PAR |
| 07:00-09:00 | Prepare for Linac access | MCR | |
| 09:00-14:00 | Linac access to investigate L4 leak | Martens, et. al. | AA-DL |
| 19:00-24:00 | Open | ||
| Wednesday, February 28 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | Open | ||
| 07:00-16:00 | RF systems maintenance | RF Group | Bring down all of Linac/PAR |
| 07:00-14:00 | Continue L4 leak investigation | Martens, et. al. | AA-DL |
| 08:00-10:00 | Prepare for Booster access | MCR | |
| 10:00-12:00 | Booster access for BTS BLM testing | Dooling | |
| 14:00-17:00 | Recover from Linac and Booster accesses | Mike Henry, MCR | |
| 17:00-19:00 | Operator training | MCR | |
| 19:00-24:00 | PAR scrubbing | MCR | |
| Thursday, February 29 | |||
| Time | Study | Studiers | Notes |
| 00:00-02:00 | Operator training | MCR | |
| 02:00-07:00 | PAR scrubbing | MCR | |
| 07:00-16:00 | RF systems maintenance | RF Group | Bring down all of Linac/PAR |
| 16:00-17:00 | Recover Linac/PAR and Booster | MCR | |
| 17:00-24:00 | Open | Linac RF systems off | |
| Friday, March 01 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | Open | Linac RF systems off | |
| 07:00-08:00 | Prepare for Linac access | MCR | |
| 08:00-15:00 | Linac access to address L4 vacuum leak | Martens, et. al. | AA-DL |
| 17:00-24:00 | No beam | Linac/PAR racked out | |
| Saturday, March 02 | |||
| Time | Study | Studiers | Notes |
| 00:00-11:00 | No beam | Linac/PAR racked out | |
| 08:00-11:00 | Remove vacuum equipment from Linac | Michalek | Linac/PAR racked out |
| 11:00-23:00 | No beam | Linac/PAR racked out | |
| 23:00-24:00 | No beam | Linac/PAR racked out | |
| Sunday, March 03 | |||
| Time | Study | Studiers | Notes |
| 00:00-11:00 | No beam | Linac/PAR racked out | |
| 11:00-23:00 | No beam | Linac/PAR racked out | |
| 23:00-24:00 | No beam | Linac/PAR racked out | |
| Monday, March 04 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | No beam | Linac/PAR racked out | |
| 07:00-08:00 | Secure Linac/PAR | Henry, MCR | shielding verification |
| 08:00-08:30 | Rack in Linac/PAR | MCR | |
| 08:30-09:30 | Recover Linac/PAR | MCR | K4 RF under RF Group control |
| 08:30-24:00 | K4 RF conditioning | RF Group | |
| Tuesday, March 05 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Wednesday, March 06 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Thursday, March 07 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | Booster extraction studies | Calvey | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Friday, March 08 | |||
| Time | Study | Studiers | Notes |
| 00:00-05:00 | PAR scrubbing/Operator training | MCR | |
| 05:00-07:00 | Shut down Linac/PAR, Booster, and Zone F | MCR | |
| 06:30-15:30 | Zone F access | APSU | |
| 07:00-09:00 | TERPC-J1 shutdown | Doktorczyk | Linac/PAR and Booster vacuum will be affected |
| 09:00-11:00 | Recover Linac/PAR | MCR | |
| 15:30-17:00 | Recover Booster | MCR | |
| 17:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Saturday, March 09 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Sunday, March 10 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-12:00 | PAR scrubbing/Operator training | MCR | |
| 12:00-16:00 | ML testing with low continuous charge | Kuklev | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Monday, March 11 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-09:00 | Open ITS for tour | MCR | LOTO K1-K3 |
| 08:00-09:00 | Prepare for PAR access | MCR | |
| 09:00-10:00 | Tour of ITS | John Byrd | |
| 09:00-10:00 | PAR access to install rad probes | Harkay | |
| 10:00-12:00 | Recover from PAR access | MCR | |
| 12:00-16:00 | PAR studies to test rad probes | Harkay | |
| 16:00-24:00 | |||
| Tuesday, March 12 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | PAR scrubbing/Operator training | MCR | |
| 07:00-09:00 | Prepare for PAR access | MCR | |
| 09:00-11:30 | PAR access to reconfigure rad probes | Harkay | |
| 11:30-13:00 | Recover from PAR access | MCR | |
| 13:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Wednesday, March 13 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:30 | PAR studies to test rad probes | Harkay | |
| 16:30-18:00 | IETS checkout | Calvey | extraction to BTX dump |
| 18:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Thursday, March 14 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | |||
| 07:00-08:00 | Prepare for PAR access and shutdown Booster | MCR | |
| 08:00-10:00 | Reconfigure 411/412 UPS-B | Doktorczyk | Linac/PAR and Booster equipment off and ACIS in CA mode |
| 08:00-10:00 | Install new ACIS Interface chassis at K6 | Yawei Yang | |
| 08:30-09:30 | ITS access to measure waveguide | Meyer | |
| 09:00-10:00 | PAR access to remove rad probes | Harkay | |
| 10:00-11:00 | ACIS shutdown validation test for RF at K6 | Yawei Yang | |
| 10:00-12:00 | Recover from PAR access | MCR | |
| 12:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Friday, March 15 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:30-20:30 | IETS checkout | Calvey | extraction to BTX dump <= 5 nC |
| 16:00-24:00 | Beam stability checkout | MCR | directions from Calvey |
| Saturday, March 16 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | Beam stability checkout | MCR | directions from Calvey |
| 08:00-16:00 | Beam stability checkout | MCR | directions from Calvey |
| 16:00-24:00 | Beam stability checkout | MCR | directions from Calvey |
| Sunday, March 17 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | Beam stability checkout | MCR | directions from Calvey |
| 08:00-16:00 | Beam stability checkout | MCR | directions from Fystro |
| 16:00-24:00 | Beam stability checkout | MCR | directions from Fystro |
| Monday, March 18 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | Beam stability checkout | MCR | directions from Fystro |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Tuesday, March 19 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Wednesday, March 20 | |||
| Time | Study | Studiers | Notes |
| 00:00-06:00 | PAR scrubbing/Operator training | MCR | |
| 06:00-08:00 | Prepare for Linac access | MCR | |
| 08:00-10:00 | Linac access to address water leak at L4 | Wright | |
| 10:00-12:00 | Recover and tune-up Linac/PAR | MCR | |
| 12:00-16:00 | Beam stability checkout | MCR | directions from Fystro |
| 16:00-24:00 | Beam stability checkout | MCR | directions from Fystro |
| Thursday, March 21 | |||
| Time | Study | Studiers | Notes |
| 00:00-09:00 | Beam stability checkout | MCR | directions from Fystro |
| 09:00-17:00 | Booster extraction studies | Calvey | extraction to BTX dump <= 5 nC |
| 17:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Friday, March 22 | |||
| Time | Study | Studiers | Notes |
| 00:00-09:00 | PAR scrubbing/Operator training | MCR | |
| 09:00-10:00 | Set up Booster | Calvey | extraction to BTX dump <= 5 nC |
| 10:00-16:00 | BTS trajectory measurement software development | Sajaev | extraction to BTX dump <= 5 nC |
| 16:00-24:00 | Beam stability checkout | MCR | |
| Saturday, March 23 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | Beam stability checkout | MCR | |
| 08:00-16:00 | Beam stability checkout | MCR | |
| 16:00-24:00 | Beam stability checkout | MCR | |
| Sunday, March 24 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | Beam stability checkout | MCR | |
| 08:00-12:00 | Beam stability checkout | MCR | |
| 12:00-16:00 | ML testing with low continuous charge | Kuklev | |
| 16:00-24:00 | Beam stability checkout | MCR | |
| Monday, March 25 | |||
| Time | Study | Studiers | Notes |
| 00:00-06:00 | Beam stability checkout | MCR | |
| 06:00-08:00 | Prepare for Linac access | MCR | open ITS |
| 08:00-14:00 | Linac access to install new RG1 gun | Hoyt, et. al. | ITS must be open as well |
| 08:00-16:00 | Troubleshoot BTS current monitor | Keane | |
| 09:00-11:00 | Linac timing updates and K2 scope setup | Ran Hong | |
| 11:00-12:00 | IETS firmware updates | Fors | All RF systems must be off (Linac, PAR, Booster, and SR) |
| 14:00-16:00 | Recover and tune-up Linac | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Tuesday, March 26 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 06:00-08:00 | Prepare for Linac access | MCR | open ITS |
| 08:00-16:00 | Linac access to install new RG1 gun | Hoyt, et. al. | ITS must be open as well |
| 08:00-09:00 | Prepare for Booster access | MCR | |
| 09:00-10:00 | Booster access for LP11 rad monitor source check | Henry | |
| 09:00-11:00 | Linac timing updates | Ran Hong | |
| 10:00-11:00 | Recover Booster | MCR | |
| 16:00-24:00 | No beam | MCR | |
| Wednesday, March 27 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | No beam | MCR | |
| 06:00-08:00 | Prepare for Booster access | MCR | open ITS |
| 08:00-14:00 | Linac access to install new RG1 gun | Michalek | ITS must be open as well |
| 08:00-14:00 | Booster access to repair BTS:FS2 | Erwin | |
| 09:00-11:00 | Linac timing updates | Ran Hong | |
| 14:00-16:00 | Recover and tune-up Linac/PAR and Booster | MCR | |
| 16:00-24:00 | No beam | MCR | |
| Thursday, March 28 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | No beam | MCR | |
| 07:00-08:00 | Linac access to remove bakeout | Michalek | |
| 07:00-09:00 | Recover Booster | MCR | |
| 08:00-09:00 | Put ITS gun under vacuum | Michalek | |
| 08:00-09:00 | Recover Linac/PAR | MCR | hold K1-3 HV keys until ITS secure |
| 09:00-17:00 | Booster extraction studies | Calvey | extraction to BTX dump <= 5 nC |
| 17:00-24:00 | RG1 gun commissioning | Lobach | |
| Friday, March 29 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Saturday, March 30 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-12:00 | BTS CM investigation/repair | Keane | |
| 12:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Sunday, March 31 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Monday, April 01 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Tuesday, April 02 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | Booster studies | Calvey | extraction to BTX dump <= 5 nC |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Wednesday, April 03 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Thursday, April 04 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Friday, April 05 | |||
| Time | Study | Studiers | Notes |
| 00:00-07:00 | PAR scrubbing/Operator training | MCR | |
| 07:00-10:00 | BTS BESOCM validation | Keane | |
| 10:00-13:00 | Open | ||
| 13:00-14:00 | S:IK timing sync | Carwardine, Fors | |
| 14:00-15:00 | BAM stability measurements | Fors | |
| 15:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Saturday, April 06 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Sunday, April 07 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |
| Monday, April 08 | |||
| Time | Study | Studiers | Notes |
| 00:00-08:00 | PAR scrubbing/Operator training | MCR | |
| 08:00-16:00 | PAR scrubbing/Operator training | MCR | |
| 16:00-24:00 | PAR scrubbing/Operator training | MCR | |