Injector Studies  

April 17th, 0800 - April 24th, 0000.

Tuesday, 04/17/2018
Time
Description
Studiers
   Comments  
 0700-0800  Injector Recovery/SR Fill  OPS
0830-1230 Investigate Booster BM 60 Hz ripples.
CY Yao, H. Shang, T. Puttkammer
No booster beam.
0900-1100
Swap the LTP BESOCM Rob Keane
WR-40090
Linac L1-L3 disabled..
1100-1200 Recover RG2 Operations OPS

1300-1500 Linac bunch charge stability study (RG2) Y. Sun
1300-1500 Troubleshoot iocbbpm3 upgrade w/booster beam
A. Pietryla Parasitic to Yine Sun Studies!
1500-1900
OPEN


1900-2000 Injector Recovery/SR Fill
OPS
2000-2100
Operator Training Thurman (Ted) Davis
2000-2400
Monitor Injectors OPS

Wednesday, 04/18/2018
Time
Description
Studiers
Comments
0000-0700 
Monitor Injectors OPS
0700-0800 Injector Recovery/SR Fill 
OPS

0830-1200
Activation locations in PAR after high-charge operation Micklich, Vacca, Calvey, Dooling H.P. Survey PAR enclosure. (10:30)!!
1030-1230 Add additional diagnostics at the L2 DMU rack for all L2 accelerating structures. T. Smith WR-40066
1300-1700
RG1 trajectory study Y. Sun
1700-1900
RG2 recovery
OPS

1900-2000 Injector Recovery/SR Fill  OPS
2000-2100 Operator Training Thurman (Ted) Davis
2000-2400 Monitor Injectors OPS

Thursday, 04/19/2018
Time
Description
Studiers
Comments
0000-0700
Monitor Injectors OPS
0700-0800 Injector Recovery/SR Fill 
OPS

0830-1430
PAR PWD study: vary harmonic rf gap voltage at fixed charge. Harkay, Calvey, Dooling
1430-1900
Troubleshooting iocbbpm3 upgrade. A. Pietryla/OPS Booster Beam Required
1900-2000 Injector Recovery/SR Fill  OPS
2200-2400
Monitor Injectors OPS

Friday, 04/20/2018
Time
Description
Studiers
Comments
0000-0700
Monitor Injectors OPS
0700-0800 Injector Recovery/SR Fill 
OPS

0830-1430 PAR high charge study with slow RF12 turn-on, take data with VSA and RF diagnostics. Calvey, Dooling
1430-1900
Booster detuning study Calvey, Berenc
1900-2000 Injector Recovery/SR Fill  OPS
2000-2400
PCG beam study Yine Sun

Saturday, 04/21/2018
Time
Description
Studiers
Comments
0000-0700
Operator Training Thurman (Ted) Davis
ACO to determine time !
0700-0800 Injector Recovery/SR Fill 
OPS
0900-1400
Booster charge-dependent transverse beam size using synch light monitor, up to 12nC Harkay
1430-1900
OPEN

1900-2000 Injector Recovery/SR Fill  OPS
2000-2400
Monitor Injectors OPS
Sunday, 04/22/2018
Time
Description
Studiers
Comments
0000-0700 Operator Training Thurman (Ted) Davis ACO to determine time !
0700-0800 Injector Recovery/SR Fill 
OPS

1900-2000 Injector Recovery/SR Fill  OPS
2000-2400
Monitor Injectors OPS
Monday, 04/23/2018
Time
Description
Studiers
Comments
0000-0700 Operator Training Thurman (Ted) Davis ACO to determine time !
0700-0800
Injector Recovery/SR Fill OPS

0900-1600
High charge studies with PAR fundamental rf1 only. Yao
1600-1900 PAR high charge studies Harkay, Calvey, Berenc
1900-2000
Injector Recovery/SR Fill OPS

2000-2400 Monitor Injectors OPS

Tuesday, 04/24/2018
Time
Description
Studiers
Comments
0000-0700 Monitor Injectors OPS

0700-0800 Injector Recovery/SR Fill OPS  
0900-1500 Characterize RF feedback loops. Berenc, RF techs
1900-2000 Injector Recovery/SR Fill
OPS

2000-2400
Monitor Injectors OPS