Injector Studies Schedule |
Thursday, January 4 – TBD |
|
|
|
|
Thursday, January 04 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-13:00 |
New Linac RF source patch panel installation |
Yawei Yang |
|
13:00-15:00 |
Recover and tune-up Linac |
MCR |
|
15:00-17:00 |
Operator training |
MCR |
|
17:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, January 05 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-13:00 |
Booster Controlled Access system validation |
Shoaf, MCR |
|
13:00-17:00 |
Set up PAR for scrubbing with HarmRF and FF |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, January 06 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, January 07 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, January 08 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
RG1 kicker validation application checkout |
Fystro |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, January 09 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
PAR HP surveys with beam to PTB stop |
Mike Henry, Harkay |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, January 10 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00 AM |
UPS-INJ A and Central UPS INJ A replacement begins |
Doktorczyk |
|
07:00-09:00 |
Booster tunnel pre-closure checkouts |
|
|
10:00-15:00 |
Booster tunnel closure |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, January 11 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-17:00 |
352 MHz waveguide air PSS system calibration |
RF Group |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, January 12 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
Lab closed |
09:00-17:00 |
PAR scrubbing |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, January 13 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, January 14 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, January 15 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
Lab holiday |
09:00-17:00 |
PAR scrubbing |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, January 16 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-15:00 |
Booster dipole start/troubleshooting |
PS Group |
|
09:00-15:00 |
Troubleshoot 9.77 MHz source dropouts |
RF Group |
|
09:00-15:00 |
RF5 start-up and ACIS shutdown validation |
RF Group |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, January 17 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-10:00 |
Prepare for UPS shutdown |
MCR |
all Linac and PAR RF down |
07:00-17:00 |
RF5 checkout/conditioning |
RF Group |
|
10:00-12:00 |
Operator training |
MCR |
|
12:00-15:00 |
Booster dipole start/troubleshooting |
PS Group |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, January 18 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-09:00 |
Booster dipole start/troubleshooting |
PS Group |
|
09:00-10:00 |
Booster dipole ACIS shutdown validation |
PS Group/MCR |
|
10:00-24:00 |
Booster magnet power supply checkout |
PS Group |
|
10:00-24:00 |
Booster RF conditioning |
RF Group |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, January 19 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
|
|
|
09:00-17:00 |
|
|
|
15:00-17:00 |
|
|
|
17:00-19:00 |
Operator training |
MCR |
|
17:00-24:00 |
|
|
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, January 20 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, January 21 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, January 22 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-15:00 |
Switch K2 to all digital readbacks |
Yawei Yang, Grass Wang, Nick DiMonte, Greg Fystro |
|
09:00-10:00 |
Replace directional coupler in Linac source rack |
Yawei Yang |
All Linac RF systems off |
15:00-21:00 |
Linac studies |
Lobach, Mohsen |
|
16:00-17:00 |
Replace 352 MHz source for PAR |
Berenc |
|
21:00-23:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, January 23 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-17:00 |
PAR scrubbing |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, January 24 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-17:00 |
Test RG1 kicker validation script |
Fystro |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, January 25 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-13:00 |
K4 LLRF investigation/troubleshooting |
Yawei Yang |
|
13:00-17:00 |
PAR scrubbing |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, January 26 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-17:00 |
Linac ML studies |
Kuklev, Mohsen |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, January 27 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, January 28 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, January 29 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
06:00-08:00 |
Shut down Booster power supplies |
Puttkammer |
|
07:00-09:00 |
Operator training |
MCR |
|
08:00-14:00 |
Building 420 emergency power shutdown |
Markovich |
|
13:00-15:00 |
PAR training |
Harkay, Yine Sun, Mohsen |
|
14:00-15:00 |
Recover Booster power supplies |
Puttkammer |
|
15:00-19:00 |
Linac ML studies |
Kuklev, Yine Sun, Lobach, Mohsen |
|
19:00-21:00 |
Operator training |
MCR |
|
21:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, January 30 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
BEFI validation |
Sereno |
requires Booster dipole on, EK off |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, January 31 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-11:00 |
Linac console test |
MCR |
|
19:00-17:00 |
BEFI validation |
Sereno |
requires Booster dipole on, EK off |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, February 01 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-10:00 |
Prepare for Booster access |
MCR |
|
10:00-11:00 |
Booster access for RSS tag replacement |
Vanwingeren |
|
11:00-12:00 |
Recover Booster |
MCR |
|
12:00-17:00 |
BEFI validation |
Sereno |
requires Booster dipole on, EK off |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, February 02 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-09:00 |
Reboot iocinjtime, iocmtime, and IETS and switch master oscillator reference |
Fors |
No IETS triggers, no PAR extraction |
09:00-17:00 |
BEFI validation |
Sereno |
requires Booster dipole on, EK off |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, February 03 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, February 04 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, February 05 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
Prepare for Booster beam |
MCR |
|
15:00-17:00 |
|
|
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, February 06 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-11:00 |
Troubleshoot Booster tune measurement RF |
Fors |
No beam, PAR RF off |
09:00-15:00 |
BEFI validation |
Sereno |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, February 07 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-17:00 |
BEFI validation |
Sereno |
|
12:00-14:00 |
Switch PAR to IETS |
Fors |
PAR RF off |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, February 08 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
BEFI validation |
Sereno |
|
15:00-16:00 |
Operator training |
MCR |
|
17:00-24:00 |
Booster beam studies |
Calvey |
Zone F tunnel search requires HP approval |
|
|
|
|
Friday, February 09 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
BEFI validation |
Sereno |
|
15:00-17:00 |
Operator training |
MCR |
|
17:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, February 10 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, February 11 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, February 12 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-08:00 |
Prepare for Linac/PAR access |
MCR |
|
08:00-11:00 |
Install replacement preamp at K4 |
Yawei Yang |
|
08:00-15:00 |
BEFI validation |
Sereno |
|
08:00-08:30 |
Linac/PAR access to remove LOTO for stops |
MCR/SI/MOM |
|
08:30-11:00 |
Linac/PAR access to prepare for gamma probe install |
Harkay |
|
11:00-12:00 |
Test new preamp at K4 |
Yawei Yang |
|
11:00-12:00 |
Recover Linac/PAR |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
15:00-17:00 |
Operator training |
MCR |
|
17:00-24:00 |
Booster beam studies |
Calvey |
Zone F tunnel search requires HP approval |
|
|
|
|
Tuesday, February 13 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-10:00 |
Linac modulator pump filter replacement |
Wright |
All Linac RF systems off |
10:00-17:00 |
BEFI validation |
Sereno |
|
15:00-17:00 |
Operator training |
MCR |
|
17:00-24:00 |
Booster beam studies |
Calvey |
Zone F tunnel search requires HP approval |
|
|
|
|
Wednesday, February 14 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-10:00 |
Operator testing |
MCR |
|
09:00-15:00 |
PAR scrubbing |
MCR |
|
15:00-16:00 |
Reconfigure IETS |
Fors |
all Linac, PAR, and Booster RF down |
15:00-17:00 |
Operator training |
MCR |
|
17:00-24:00 |
Booster beam studies |
Calvey |
Zone F tunnel search requires HP approval |
|
|
|
|
Thursday, February 15 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-13:00 |
BEFI validation |
Sereno |
|
14:00-15:00 |
Prepare Booster tunnel, rack out and HP survey |
|
Bring to AA Doors locked |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, February 16 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-15:00 |
Pull ion pump cables for BTS |
Meade Electric |
|
07:00-17:00 |
420 RF system PSS air calibration |
RF Group |
No 420 RF systems may be turned on until the completion of this work. |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, February 17 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, February 18 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, February 19 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-15:00 |
Pull fiber along BTS from Booster to SR |
Dooling |
|
07:00-17:00 |
420 RF system PSS air calibration |
RF Group |
No 420 RF systems may be turned on until the completion of this work. |
08:00-14:00 |
Vent, connect, pump down, and leak check near HET stop |
Clute, et. al. |
|
09:00-09:30 |
Bring down all injector RF systems |
MCR |
|
09:30-10:30 |
Reboot of IETS system |
Fors |
all Linac, PAR, and Booster RF down |
11:00-15:00 |
Iocinjtime reboots |
Ran Hong, Fors, MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
Linac L3 trajectory tune-up |
Lobach |
|
|
|
|
|
Tuesday, February 20 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-17:00 |
Vacuum leak checking of BTS inside Booster |
Clute, et. al. |
|
08:00:00 AM |
ICR-UPS-B work to begin |
Doktorczyk |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Wednesday, February 21 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
07:00-08:00 |
Booster tunnel search and closure |
MCR |
|
08:00-09:00 |
Booster recovery |
MCR |
RF5 remains off, only need dipole and BEK on |
09:00-17:00 |
BEFI validation |
Sereno |
|
10:00-12:00 |
Address IETS reboot P0 alignment |
Fors, DiMonte, et. al. |
Needs beam to PTB stop |
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, February 22 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-13:00 |
Operator qualification testing |
MCR |
|
13:00-17:00 |
Open |
|
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Friday, February 23 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-09:00 |
Operator training |
MCR |
|
09:00-15:00 |
|
|
|
15:00-17:00 |
|
|
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Saturday, February 24 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Sunday, February 25 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-12:00 |
PAR scrubbing |
MCR |
|
12:00-14:00 |
Operator training |
MCR |
|
14:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Monday, February 26 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-08:00 |
Prepare for Booster access |
MCR |
Alternate LOTO for BTS quads |
07:00-16:00 |
RF systems maintenance |
RF Group |
Bring down all of Linac/PAR |
08:00-10:00 |
Booster access for BTS:FS2 investigation |
Erwin |
All LOTO locks overlocked |
10:00-12:00 |
Booster access for BTS quads testing |
Jordan, Puttkammer |
Coordinate HET quads LOTO |
11:00-11:30 |
K2 RF ACIS shutdown validation |
MCR, Yawei Yang |
K2 LLRF ACIS interface replacement |
12:00-13:00 |
Recover from Booster access |
MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Tuesday, February 27 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-16:00 |
RF systems maintenance |
RF Group |
Bring down all of Linac/PAR |
07:00-09:00 |
Prepare for Linac access |
MCR |
|
09:00-14:00 |
Linac access to investigate L4 leak |
Martens, et. al. |
AA-DL |
19:00-24:00 |
Open |
|
|
|
|
|
|
Wednesday, February 28 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
Open |
|
|
07:00-16:00 |
RF systems maintenance |
RF Group |
Bring down all of Linac/PAR |
07:00-14:00 |
Continue L4 leak investigation |
Martens, et. al. |
AA-DL |
08:00-10:00 |
Prepare for Booster access |
MCR |
|
10:00-12:00 |
Booster access for BTS BLM testing |
Dooling |
|
14:00-17:00 |
Recover from Linac and Booster accesses |
Mike Henry, MCR |
|
17:00-19:00 |
Operator training |
MCR |
|
19:00-24:00 |
PAR scrubbing |
MCR |
|
|
|
|
|
Thursday, February 29 |
Time |
Study |
Studiers |
Notes |
00:00-02:00 |
Operator training |
MCR |
|
02:00-07:00 |
PAR scrubbing |
MCR |
|
07:00-16:00 |
RF systems maintenance |
RF Group |
Bring down all of Linac/PAR |
16:00-17:00 |
Recover Linac/PAR and Booster |
MCR |
|
17:00-24:00 |
Open |
|
Linac RF systems off |
|
|
|
|
Friday, March 01 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
Open |
|
Linac RF systems off |
07:00-08:00 |
Prepare for Linac access |
MCR |
|
08:00-15:00 |
Linac access to address L4 vacuum leak |
Martens, et. al. |
AA-DL |
17:00-24:00 |
No beam |
|
Linac/PAR racked out |
|
|
|
|
Saturday, March 02 |
Time |
Study |
Studiers |
Notes |
00:00-11:00 |
No beam |
|
Linac/PAR racked out |
08:00-11:00 |
Remove vacuum equipment from Linac |
Michalek |
Linac/PAR racked out |
11:00-23:00 |
No beam |
|
Linac/PAR racked out |
23:00-24:00 |
No beam |
|
Linac/PAR racked out |
|
|
|
|
Sunday, March 03 |
Time |
Study |
Studiers |
Notes |
00:00-11:00 |
No beam |
|
Linac/PAR racked out |
11:00-23:00 |
No beam |
|
Linac/PAR racked out |
23:00-24:00 |
No beam |
|
Linac/PAR racked out |
|
|
|
|
Monday, March 04 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
No beam |
|
Linac/PAR racked out |
07:00-08:00 |
Secure Linac/PAR |
Henry, MCR |
shielding verification |
08:00-08:30 |
Rack in Linac/PAR |
MCR |
|
08:30-09:30 |
Recover Linac/PAR |
MCR |
K4 RF under RF Group control |
08:30-24:00 |
K4 RF conditioning |
RF Group |
|
|
|
|
|
Tuesday, March 05 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Wednesday, March 06 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Thursday, March 07 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
Booster extraction studies |
Calvey |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Friday, March 08 |
Time |
Study |
Studiers |
Notes |
00:00-05:00 |
PAR scrubbing/Operator training |
MCR |
|
05:00-07:00 |
Shut down Linac/PAR, Booster, and Zone F |
MCR |
|
06:30-15:30 |
Zone F access |
APSU |
|
07:00-09:00 |
TERPC-J1 shutdown |
Doktorczyk |
Linac/PAR and Booster vacuum will be affected |
09:00-11:00 |
Recover Linac/PAR |
MCR |
|
15:30-17:00 |
Recover Booster |
MCR |
|
17:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Saturday, March 09 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Sunday, March 10 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-12:00 |
PAR scrubbing/Operator training |
MCR |
|
12:00-16:00 |
ML testing with low continuous charge |
Kuklev |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Monday, March 11 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-09:00 |
Open ITS for tour |
MCR |
LOTO K1-K3 |
08:00-09:00 |
Prepare for PAR access |
MCR |
|
09:00-10:00 |
Tour of ITS |
John Byrd |
|
09:00-10:00 |
PAR access to install rad probes |
Harkay |
|
10:00-12:00 |
Recover from PAR access |
MCR |
|
12:00-16:00 |
PAR studies to test rad probes |
Harkay |
|
16:00-24:00 |
|
|
|
|
|
|
|
Tuesday, March 12 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
PAR scrubbing/Operator training |
MCR |
|
07:00-09:00 |
Prepare for PAR access |
MCR |
|
09:00-11:30 |
PAR access to reconfigure rad probes |
Harkay |
|
11:30-13:00 |
Recover from PAR access |
MCR |
|
13:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Wednesday, March 13 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:30 |
PAR studies to test rad probes |
Harkay |
|
16:30-18:00 |
IETS checkout |
Calvey |
extraction to BTX dump |
18:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Thursday, March 14 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
|
|
|
07:00-08:00 |
Prepare for PAR access and shutdown Booster |
MCR |
|
08:00-10:00 |
Reconfigure 411/412 UPS-B |
Doktorczyk |
Linac/PAR and Booster equipment off and ACIS in CA mode |
08:00-10:00 |
Install new ACIS Interface chassis at K6 |
Yawei Yang |
|
08:30-09:30 |
ITS access to measure waveguide |
Meyer |
|
09:00-10:00 |
PAR access to remove rad probes |
Harkay |
|
10:00-11:00 |
ACIS shutdown validation test for RF at K6 |
Yawei Yang |
|
10:00-12:00 |
Recover from PAR access |
MCR |
|
12:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Friday, March 15 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:30-20:30 |
IETS checkout |
Calvey |
extraction to BTX dump <= 5 nC |
16:00-24:00 |
Beam stability checkout |
MCR |
directions from Calvey |
|
|
|
|
Saturday, March 16 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
Beam stability checkout |
MCR |
directions from Calvey |
08:00-16:00 |
Beam stability checkout |
MCR |
directions from Calvey |
16:00-24:00 |
Beam stability checkout |
MCR |
directions from Calvey |
|
|
|
|
Sunday, March 17 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
Beam stability checkout |
MCR |
directions from Calvey |
08:00-16:00 |
Beam stability checkout |
MCR |
directions from Fystro |
16:00-24:00 |
Beam stability checkout |
MCR |
directions from Fystro |
|
|
|
|
Monday, March 18 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
Beam stability checkout |
MCR |
directions from Fystro |
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Tuesday, March 19 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Wednesday, March 20 |
Time |
Study |
Studiers |
Notes |
00:00-06:00 |
PAR scrubbing/Operator training |
MCR |
|
06:00-08:00 |
Prepare for Linac access |
MCR |
|
08:00-10:00 |
Linac access to address water leak at L4 |
Wright |
|
10:00-12:00 |
Recover and tune-up Linac/PAR |
MCR |
|
12:00-16:00 |
Beam stability checkout |
MCR |
directions from Fystro |
16:00-24:00 |
Beam stability checkout |
MCR |
directions from Fystro |
|
|
|
|
Thursday, March 21 |
Time |
Study |
Studiers |
Notes |
00:00-09:00 |
Beam stability checkout |
MCR |
directions from Fystro |
09:00-17:00 |
Booster extraction studies |
Calvey |
extraction to BTX dump <= 5 nC |
17:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Friday, March 22 |
Time |
Study |
Studiers |
Notes |
00:00-09:00 |
PAR scrubbing/Operator training |
MCR |
|
09:00-10:00 |
Set up Booster |
Calvey |
extraction to BTX dump <= 5 nC |
10:00-16:00 |
BTS trajectory measurement software development |
Sajaev |
extraction to BTX dump <= 5 nC |
16:00-24:00 |
Beam stability checkout |
MCR |
|
|
|
|
|
Saturday, March 23 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
Beam stability checkout |
MCR |
|
08:00-16:00 |
Beam stability checkout |
MCR |
|
16:00-24:00 |
Beam stability checkout |
MCR |
|
|
|
|
|
Sunday, March 24 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
Beam stability checkout |
MCR |
|
08:00-12:00 |
Beam stability checkout |
MCR |
|
12:00-16:00 |
ML testing with low continuous charge |
Kuklev |
|
16:00-24:00 |
Beam stability checkout |
MCR |
|
|
|
|
|
Monday, March 25 |
Time |
Study |
Studiers |
Notes |
00:00-06:00 |
Beam stability checkout |
MCR |
|
06:00-08:00 |
Prepare for Linac access |
MCR |
open ITS |
08:00-14:00 |
Linac access to install new RG1 gun |
Hoyt, et. al. |
ITS must be open as well |
08:00-16:00 |
Troubleshoot BTS current monitor |
Keane |
|
09:00-11:00 |
Linac timing updates and K2 scope setup |
Ran Hong |
|
11:00-12:00 |
IETS firmware updates |
Fors |
All RF systems must be off (Linac, PAR, Booster, and SR) |
14:00-16:00 |
Recover and tune-up Linac |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Tuesday, March 26 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
06:00-08:00 |
Prepare for Linac access |
MCR |
open ITS |
08:00-16:00 |
Linac access to install new RG1 gun |
Hoyt, et. al. |
ITS must be open as well |
08:00-09:00 |
Prepare for Booster access |
MCR |
|
09:00-10:00 |
Booster access for LP11 rad monitor source check |
Henry |
|
09:00-11:00 |
Linac timing updates |
Ran Hong |
|
10:00-11:00 |
Recover Booster |
MCR |
|
16:00-24:00 |
No beam |
MCR |
|
|
|
|
|
Wednesday, March 27 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
No beam |
MCR |
|
06:00-08:00 |
Prepare for Booster access |
MCR |
open ITS |
08:00-14:00 |
Linac access to install new RG1 gun |
Michalek |
ITS must be open as well |
08:00-14:00 |
Booster access to repair BTS:FS2 |
Erwin |
|
09:00-11:00 |
Linac timing updates |
Ran Hong |
|
14:00-16:00 |
Recover and tune-up Linac/PAR and Booster |
MCR |
|
16:00-24:00 |
No beam |
MCR |
|
|
|
|
|
Thursday, March 28 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
No beam |
MCR |
|
07:00-08:00 |
Linac access to remove bakeout |
Michalek |
|
07:00-09:00 |
Recover Booster |
MCR |
|
08:00-09:00 |
Put ITS gun under vacuum |
Michalek |
|
08:00-09:00 |
Recover Linac/PAR |
MCR |
hold K1-3 HV keys until ITS secure |
09:00-17:00 |
Booster extraction studies |
Calvey |
extraction to BTX dump <= 5 nC |
17:00-24:00 |
RG1 gun commissioning |
Lobach |
|
|
|
|
|
Friday, March 29 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Saturday, March 30 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-12:00 |
BTS CM investigation/repair |
Keane |
|
12:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Sunday, March 31 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Monday, April 01 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Tuesday, April 02 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
Booster studies |
Calvey |
extraction to BTX dump <= 5 nC |
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Wednesday, April 03 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Thursday, April 04 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Friday, April 05 |
Time |
Study |
Studiers |
Notes |
00:00-07:00 |
PAR scrubbing/Operator training |
MCR |
|
07:00-10:00 |
BTS BESOCM validation |
Keane |
|
10:00-13:00 |
Open |
|
|
13:00-14:00 |
S:IK timing sync |
Carwardine, Fors |
|
14:00-15:00 |
BAM stability measurements |
Fors |
|
15:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Saturday, April 06 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Sunday, April 07 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|
|
|
|
|
Monday, April 08 |
Time |
Study |
Studiers |
Notes |
00:00-08:00 |
PAR scrubbing/Operator training |
MCR |
|
08:00-16:00 |
PAR scrubbing/Operator training |
MCR |
|
16:00-24:00 |
PAR scrubbing/Operator training |
MCR |
|