Machine Studies
Draft Schedule for Run01-14 2025
May 1 0000 – May 1 1159
Time |
Descriptions |
Studiers |
SR Status |
|
Thursday, May 1, 2025 |
|
|
0000 |
Refill to 130 mA with 216 bunches. |
Emery |
Stored Beam and Injection |
0000-0300 |
PAR RF12 power limit increase |
Smith, Mohsen |
Stored Beam and Limited Injection |
0300-0600 |
PAR LLRF switch over |
RF group, Berenc |
Stored Beam and Limited Injection |
0600 |
Tune BLS for 200 mA. |
Berenc |
Stored Beam and Injection |
0600-1200 |
SR 6.5 MeV RF voltage, ID gaps closed, 216 bunches, 200 mA |
RF group, Berenc, Borland |
Stored Beam and Injection |
1200-1400 |
Measure the minimum achievable gap for the individual ID (may overlap with above) |
Li |
Stored Beam and Injection |
1400-1500 |
test the LB+ re-sync and reboot procedures (if there is time) |
Berkland |
Stored Beam and Injection |
1500-1630 |
Routine response matrix (if there is time). |
Sajaev |
Stored Beam and Injection |
1630-1700 |
Untune (park) the BLS cavity (need some moderate stored current) |
Berenc |
No beam |
1700-2100 |
SR untuned (parked) BLS running at 4 K with 200 mA. |
Fuerst, Kelly |
Stored Beam and Injection |
2100-2400 |
Tuning the BLS while running at 4 K with 200 mA. |
Fuerst, Kelly, Berenc |
Stored Beam and Injection |