Machine Studies
Draft Schedule for Run03-7, 2026
October 19 0800 – October 20 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, October 19, 2026 |
|
|
0800-0900 |
Response matrix measurement |
Dick |
Stored beam & injection |
0830-1000 |
Linac K4 conditioning. Strive for 425 MeV linac beam after this |
Meyer |
Stored beam & No injection |
0900-1700 |
RF Group SSA work |
RF Group |
No Beam |
0900-1100 |
Investigate power supply P4V2 |
Puttkammer |
No Beam |
0900-1000 |
Pem conditioning test with no beam |
C. Xu |
No Beam |
0930-1130 |
Install a coax cable from the Pearson coil |
Keane |
No Beam |
1000 |
Start recovering injectors for 425 MeV if feasible in parallel with below |
Y. Sun, Mohsen, Calvey |
No Beam |
1000-1600 |
ICR VID100 testing using RG2/PCG beam. Impacts the 1 Hz/60Hz signals. |
Y. Sun, R. Hong et al. |
No Beam |
1100-1400 |
PCB-coil based magnet measurements for S01DSID and S11USID |
Wei |
No Beam |
1600-1800 |
Operator training |
Ops |
Stored beam & injection |
1700-1800 |
SR recovery (check start time with rf group) |
Ops |
Stored beam & injection |
|
|
|
|
1800-2100 |
Orbit to RF phase feedback with S37-FOFB |
Kallakuri Carwardine Brill |
Stored beam & injection |
2100-2300 |
Evaluate SR 1 Hz motion under various conditions |
Cheng |
Stored beam & injection |
2300-0100 |
Pem conditioning software test with beam, i.e. measure tunes |
C. Xu |
Stored beam & injection |
|
Tuesday October 20, 2026 |
|
|
0100-0300 |
Operator training |
Ops |
Stored beam & injection |
0300-0400 |
Open |
|
Stored beam & injection |
0400-0600 |
SR set up |
Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |