Machine Studies

Schedule for Run26-3, 2026

September 2st 0800 – September 9th, 0800



Time

Descriptions

Studiers

SR Status


Wednesday, September 2, 2026



0000-0400

General machine start-up

Technical groups

No Stored Beam

0400-0800

General machine start-up

Technical groups

No Stored Beam

0800-1200

MPS validations

Controls/Ops

No Stored Beam

1200-1600

Set up injector current monitors

Rob Keane

No Stored Beam

1600-2000

General machine start-up

Technical groups

No Stored Beam

2000-2400

Swap-out permissive validation

Borland

No Stored Beam

2000-2400

Injector available


No Stored Beam


Thursday, September 3, 2026



0000-0400

General machine start-up

Technical groups

No Stored Beam

0400-0800

General machine start-up

Technical groups

No Stored Beam

0800-0900

0.5 mA ID gaps open MPS validation with all SR RF systems

Ops

Stored Beam & Injection

0900-0910

Check MOFB 5 mA ID gaps open

Emery

Stored Beam & Injection

0900-1200

BM BPLD validations 5 mA

Bui, Shang, Smith

Stored Beam & Injection

1200-1400

Dimtel LFB/TFB timing checks 1 mA ID gaps closed from here on

Kallakuri

Stored Beam & Injection

1400-1600

S38 (and other) collimator positioning using postmortems 5 mA

Dick

Stored Beam & Injection

1600-2000

Determine whether BLS runs well for a range of voltages for > 20 mA

Emery Fuerst

Stored Beam & Injection

1600-2400

RF conditioning with beam with 216 bunches. Challenge BLS with some voltage during this time

Emery Ops

Stored Beam & Injection

2000-2400

LFB setup for 216 bunches at moderate current (could start later than expected)

Kallakuri

Stored Beam & Injection


Friday, September 4, 2026



0000-0800

RF conditioning with beam with 216 bunches. 200 mA

Ops

Stored Beam & Injection


Start of machine studies proper



0800-1000

Linac rf timing switch and beam tuning

Ran Hong, Y. Sun, Y. Yang

Stored Beam & Injection

1000-1200

Check out SR orbit. May need to re-measure bpm offsets

Emery, Dick

Stored Beam & Injection

1200-1600

Orbit response and optics correction. (split time with above to allow calculations)

Dick Emery

Stored Beam & Injection

1400-1600

Punch down vertical fast correctors for 60 Hz noise measurement. (FOFB related)

Emery

Stored Beam & Injection

1600-1800

Operator training (day shift)

Ops

Stored Beam & Injection

1800-2200

Hysteresis compensation for SR Q1/Q2

Chenran

Stored Beam & Injection

2200-2400

Operator training (night shift)

Ops

Stored Beam & Injection


Saturday, September 5, 2026



0000-0400

Open


Stored Beam & Injection

0400-0600

Open


Stored Beam & Injection

0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1200

Maximize aperture in SR septum area. Collimators out.

Emery

Stored Beam & Injection

1200-1600

BLS quench investigation of 130 mA decays in 48 bunches (a tougher test from previous day)

Emery Fuerst

Stored Beam & Injection

1600-1800

Open

Ops

Stored Beam & Injection

1800-2000

Operator training (night shift)

Ops

Stored Beam & Injection

2000-2400

Open


Stored Beam & Injection


Sunday, September 6, 2026



0000-0600

LFB characterization at 200 mA with grow/damp measurement

Kallakuri

Stored Beam & Injection

0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1200

Booster direct rf feedback studies. Need high charge.

Berenc Calvey Mohsen

Stored Beam & Injection

1200-1800

Gas scattering lifetime at 150 mA and 100 mA

Borland Emery

Stored Beam & Injection

1800-2400

RG1 study I

Y. Sun, Chenran

Stored Beam & Injection


Monday, September 7, 2026



0000-0200

Operator training (night shift)

Ops

Stored Beam & Injection

0200-0600

Open



0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1200

Open


Stored Beam & Injection

1200-1800

Low-beta lattice commissioning

Borland Emery Dick

Stored Beam & Injection

1800-2200

S09-FOFB (including S29 single-FOFB)

Carwardine

Stored Beam & Injection

2200-0200

Phase measurements for off-momentum beam with TBT bpms

Sajaev Dick Chenran

Stored Beam & Injection


Tuesday, September 8, 2026



0200-0400

Operator training (night shift)

Ops

Stored Beam & Injection

0400-0600

Open



0600-0800

Operator training (day shift)

Ops

Stored Beam & Injection

0800-1000

S02-IS XBPM commissioning

W. Li

Stored Beam & Injection

1000-1300

Beam loss with AC excitation

Cheng

Stored Beam & Injection

1300-2100

RG1 study I

Y. Sun, Chenran

Stored Beam & Injection

2100-2300

Revert linac timing to operational one

Ran Hong, Y. Sun

Stored Beam & Injection

2300-2400

Open


Stored Beam & Injection


Wednesday, September 9, 2026



0000-0200

Operator training (night shift)

Ops

Stored Beam & Injection

0200-0400

Open


Stored Beam & Injection

0400-0600

Final check of lattice

Emery Dick

Stored Beam & Injection

0600-0800

Prepare for User Beam Operations 200 mA – 216 bunches

OPS

Stored Beam & Injection