Machine Studies

Draft Schedule for Run01-10 2025

April 1 0800 – April 2 0800



Time

Descriptions

Studiers

SR Status


Monday, April 1, 2025



0815-1000

PC Gun drive laser installation support

Erwin

No Injection/Access ITS

0815-1000

Replace flag actuator chassis

Kishbaugh

No Injection/Access ITS

0815-1000

Replace S39 IETS trigger chassis

Fors

No Injection

0815

Reboot siocrunctrl2

Berkland

No Injection

0815-1000

Reboot/swap controller training

Kreps

No Beam





1100-1400

Booster extraction studies

Calvey Dooling

Stored Beam and Injection

1400-1500

adjust the injector energy/phase

Emery

Stored Beam and Injection

1500-1600

Check Slow Beam Abort at low currents

Emery

Stored Beam and Injection

1600-1800

SR injection efficiency study

Shang

Stored Beam and Injection

1800-2200

All gaps closed at low current

Borland

Stored Beam and Injection

2400-2400

Calibrate kicks from DK and IK using Spark bpms

Borland

Stored Beam and Injection

4 h

Lifetime, bunch duration vs current and number of bunches with BLS tuned to ~700 kV

Borland

Stored Beam and Injection


Tuesday April 2, 2025



0000-0200

Microwave instability measurement at high per bunch current

Cheng

Stored Beam and Injection

0200-0400

Injector training (18-06)

Ops

Limited Injection

0400-0600

Verify 48 bunch operation

Emery

Stored Beam and Injection

0600-0800

Recover SR systems/prepare for user beam

Ops

Stored Beam and Injection