Draft Schedule for Run01-8 2025

March 17 0800 – March 19 0800



Time

Descriptions

Studiers

SR Status


Monday, March 17, 2025



0800-1100

LLRF K5 ioc update

2. B-SLM camera iocs study.

3. Reboot Frozen LB+

Grass

Limited Injection

0830-1100

Swap K5 monitor signals

Yawei/DiMonte

Limited Injection

0830-1100

Raise RF12 Par Cavity Field Probe Fast Interlock

Smith

Limited Injection

0830-1100

Troubleshoot PAR PS comms

Puttkammer

Limited Injection

0830-1100

Replace SRF-4 amp

Madden

No Beam

0830-1100

Upgrade S40:1 firmware

Ruan

No Beam

0900-1100

Verify 35ID shutters

McNamara

Access Zone F

0900-1100

Install heliax cable for S38

Kishbuagh

Access Zone F

0900-1100

Update unipolar iocs

B. Chandler

No Beam

0900-1100

Update DAQ TBT iocs

E. Chandler

No Beam

0900-1100

Downgrade Zone F firmware

Kreps

No Beam

0900-1100

Check S11 BPM cables

Diag

Access Zone B

0900-1330

Repair S33 water leak

Wright

No Beam

0900-1330

IETS ioc work

Fors

No beam/ No Injection

1330-1630

Recover SR and Injectors

Ops

Limited Injection





1430-1730

tune up RG2 for 1 nC per linac bunch to PAR

Sun

Limited Injection

1730-1830

Fill SR with 10 mA to check tunes, etc

Emery

Limited Injection

1730-2130

PAR RF 12

Mohsen

Limited Injection

2130-2230

Set up BLS for 120 mA (simultaneous with below)

Berenc

Stored Beam and Injection

2130-2400

Setup for 120 mA in 48 bunches

Calvey, Mohsen

Stored Beam and Injection


Tuesday March 18, 2025



0000-0200

Test operation at 120 mA in 48 bunches

Calvey, Mohsen

Stored Beam and Injection

0200-0600

6.5 MV and 130 mA with all ID gaps closed.

Emery or Ops?

Stored Beam and Injection





0600-1000

Linac console testing

Ramsey/Fystro

Limited Injection, not to interfere w/ K5 work

0800-1000

Run S:IS for measurements

Abid

No Beam

0800-1000

Scandanovia measurements of K5

Meyer

Limited Injection

0800-1000

PAR ioc database moves

DiMonte

No Injection





1000-1400

RG1 beam tune up

Sun

No Injection

1400

Detune BLS for next stsudy

Berenc

Stored Beam and Injection

1400-1700

Measure lifetime and bunch length vs number of bunches with 100 and 200 mA. BLS detuned

Borland

Stored Beam and Injection

1700

Restore tune of BLS

Berenc

Stored Beam and Injection

1700-2100

lattice correction and some orbit tests

Sajaev

Stored Beam and Injection

2100-2400

FOFB: investigate non-repeatability of local bump

Carwardine

Stored Beam and Injection


Wednesday March 19, 2025



0000-0300

BPM long-term stability. Swapout at 120 mA

Cheng

Stored Beam and Injection

0300-0600

LFB grow/damp. Uniform fill.

Kallakuri

Stored Beam and Injection

0600-0800

Recover SR systems/prepare for user beam

Ops

Stored Beam and Injection