Machine Studies
Draft Schedule for Run02-9, 2026
July 27 0800 – July 29 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 27, 2025 |
|
|
0800-0900 |
Orbit Response |
Dick |
Stored Beam and Injection |
0930-1030 |
FOK scope IOC work |
Grass |
No Beam |
0930-1100 |
SSA IOC reboots |
Madden |
No Beam |
0930-1130 |
Replace S21 T2 gasket |
Vargas |
No Beam |
1030-1330 |
IES DG measurements |
Grass |
No Beam |
1000-1200 |
Remote ID magnetic measurements |
W. Li |
No Beam |
0900-1500 |
Booster with direct RF feedback (Booster beam) |
Berenc, Calvey, Mohsen |
No Beam |
1500-1900 |
BLS quench recordings |
Emery Fuerst Kelly Berenc Cheng |
Stored Beam and Injection |
1900-2200 |
Beam loss with AC excitation |
Cheng |
Stored Beam and Injection |
2200-0200 |
LFB grow-damp 100 mA 216 bunches |
Kallakuri |
Stored Beam and Injection |
|
Tuesday, July 28, 2025 |
|
|
0200-0400 |
Operator training |
Ops |
Stored Beam and Injection |
0400-0600 |
Open |
|
Stored Beam and Injection |
0600-0700 |
Linac coherent transition radiation monitor test and checkout. |
Wootton |
No Beam |
0700-1000 |
PAR console testing |
McBride/Fystro |
Limited Injection |
1000-1300 |
LEA setup and Loss scenarios |
Sun HP |
No Beam |
1030-1200 |
Replace Booster tuner control card |
Berenc |
No Injection |
1300-1500 |
Laser alignment |
Dooling |
Access Linac |
1300-1500 |
K5 chassis installation |
Yawei |
No Injection |
|
|
|
|
1500-1600 |
Revisit SR lifetime dependence on chromaticity and tunes |
Emery |
Stored Beam and Injection |
1600-1800 |
Open |
|
Stored Beam and Injection |
1800-2000 |
Operator training |
Ops |
Stored Beam and Injection |
2000-2400 |
DA measurements vs tunes using IK1 timing |
Borland |
Stored Beam and Injection |
|
Wednesday, July 29, 2025 |
|
|
0000-0400 |
Magnet conditioning order |
Emery |
Stored beam & injection |
0400-0600 |
Set up SR + orbit response and chromaticity measurements |
Dick |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |