Machine Studies

Draft Schedule for Run02-10, 2026

August 5 0800 – August 5 2400



Time

Descriptions

Studiers

SR Status


Wednesday, August 5, 2025



0800-0900

Lattice measurement 10 mA

Dick

Stored Beam and Injection

0900-2000

Check out BLS cavity with 200 mA 216 bunches with various BLS tunings and main rf parameters

Emery et al

Stored Beam and Injection

0900-2000

Parasitic diagnostic study

Diag group

Stored Beam and Injection

2000-2400

PC gun beam in linac (may be canceled)

Sun

Decaying beam