Machine Studies

Draft Schedule for Run03-14, 2025

December 22 0000 – December 23 0000



Time

Descriptions

Studiers

SR Status


Monday, December 22, 2025



0000-0400

S03 FOFB. 10 mA in high charge bunch to allow PAR parasitic study

Carwardine

Stored beam & injection

0000-0200

High charge BDM measurement in the PAR (high charge only)

Mohsen

Stored beam & injection

0400-0600

Operator PAR training

Ops

Stored beam & injection

0600 or 0700

Correct the cabling of MPS chassis

Hong

Stored beam & injection

0600-0700

Check LFB functioning at high gain. Decide on LFB state for next study.

Emery, Cheng

Stored beam & injection

0700-0800

Prepare beam 48 bunches, 130 mA

Emery

Stored beam & injection

0800-0900

Open shutters. Beamlines prepare to measure beam motion. Steer 7BM for calibration (Cheng).

Ops

Stored beam & injection

0800-0900

Steer 7BM for calibration

Cheng

Stored beam & injection

0900-1400

Turn off air handling units one at a time,

MOM, Emery

Stored beam & injection

0900-1400

Measure sector 7 x-ray bpm spectrum (parallel to above)

Cheng

Stored beam & injection

1500

Close shutters, remove stored beam

Ops

Stored beam & injection

1500-1800

BTS measurements

C. Xu

Stored beam & injection

1800-2400

Optimization of lifetime and efficiency in operations lattice

Borland, Kuklev, Emery

Stored beam & injection