Machine Studies

Draft Schedule for Run01-6, 2024

June 3rd 0800 – June 5th 0800



Time

Descriptions

Studiers

SR Status


Monday, June 24, 2024



0800-0900

Reboot sioc2injorch1

Arnold

No Beam

0800-0900

Test 35BM user interface

Wootton/Stevens

No Beam

0800-1000

Investigate Booster Gespac Node 7

Puttkammer

No Injection

0800-1000

Update Libera BPM network boot settings

Brill/IT

No Beam

0800-1200

RF Source Upgrade Studies

Berenc

No Beam (SRRF up)

0800-1200

Need to fix/adjust the DC Voltage and Current read-backs for SR RAW T2 38:39

Ruan

No Beam

0800-1400

Booster ES1 work

PS Group

No Injection

0800-1600

Fix canted supply polarity

Vargas

No Beam

0800-1600

Repair/replace rack blowers

Davis

No Beam

0830-0930

PTB triple stop measurements

Hoyt

Access PAR

0830-0930

Thz monitor measurements

Wootton

Access PAR

0830-1600

Leak check and replace load at L2

MOM Vac

Access Linac

0900-1300

IETS work

Fors

No Beam/No Injection

0930-1130

IOC reboots

Controls

No Beam or Injection

1000-1600

Improve MPS/FEEPS trip point at S09-DS

Donnelly

Access SR A-C

1000-1600

Replace small chamber switches for S19-US device

Donnelly

Access SR A-C

1000-1600

Align S14-US device to IDVC

Donnelly

Access SR A-C

1000-1600

Pull new cables for radiation monitors at S01 and S15

Donnelly

Access SR A-C

1100-1400

Booster tunnel testing

Fystro/Ops

Access Booster

1100-1400

PSS End to End Test

McNamara

No Beam

1100-1500

Unlock front end shutters

Clute

Access SR A-E

1100-1500

29ID re-alignment

Clute

Access Zone D

1200-1600

RF-3 noise suppression measurements

Berenc

No Beam (SRRF up)














Tuesday, June 25 2024



0830-1200

Terminate pump down load at L2

MOM Vac

Access Linac

1200-1500

Linac RF conditioning

RF group/Ops

No Injection

0800-1600

Repair/replace rack blowers

Davis

No Beam





1900-2400

Vacuum conditioning

Ops

Stored Beam & Injection


Wednesday, June 26 2024



2400-0200

Injector training

Ops

Limited Injection

2400-0800

Vacuum conditioning

Ops

Stored Beam & Injection