Machine Studies

Draft Schedule for Run02-9, 2026

July 27 0800 – July 29 0800



Time

Descriptions

Studiers

SR Status


Monday, July 27, 2025



0800-0900

Orbit Response

Dick

Stored Beam and Injection

0930-1030

FOK scope IOC work

Grass

No Beam

0930-1100

SSA IOC reboots

Madden

No Beam

0930-1130

Replace S21 T2 gasket

Vargas

No Beam

1030-1330

IES DG measurements

Grass

No Beam

1000-1200

Remote ID magnetic measurements

W. Li

No Beam

0900-1500

Booster with direct RF feedback (Booster beam)

Berenc, Calvey, Mohsen

No Beam

1500-1900

BLS quench recordings

Emery Fuerst Kelly Berenc Cheng

Stored Beam and Injection

1900-2200

Beam loss with AC excitation

Cheng

Stored Beam and Injection

2200-0200

LFB grow-damp 100 mA 216 bunches

Kallakuri

Stored Beam and Injection


Tuesday, July 28, 2025



0200-0400

Operator training

Ops

Stored Beam and Injection

0400-0600

Open


Stored Beam and Injection

0600-0700

Linac coherent transition radiation monitor test and checkout.

Wootton

No Beam

0700-1000

PAR console testing

McBride/Fystro

Limited Injection

1000-1300

LEA setup and Loss scenarios

Sun HP

No Beam

1030-1200

Replace Booster tuner control card

Berenc

No Injection

1300-1500

Laser alignment

Dooling

Access Linac

1300-1500

K5 chassis installation

Yawei

No Injection





1500-1600

Revisit SR lifetime dependence on chromaticity and tunes

Emery

Stored Beam and Injection

1600-1800

Open


Stored Beam and Injection

1800-2000

Operator training

Ops

Stored Beam and Injection

2000-2400

DA measurements vs tunes using IK1 timing

Borland

Stored Beam and Injection


Wednesday, July 29, 2025



0000-0400

Magnet conditioning order

Emery

Stored beam & injection

0400-0600

Set up SR + orbit response and chromaticity measurements

Dick

Stored beam & injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection