Machine Studies

Schedule for Run24-2, 2024

September 9th 0800 – September 16th, 0800



Time

Descriptions

Studiers

SR Status


Monday, September 9, 2024



0800-1200

MPS validations, Main and BM BPLDs

Bui, M. Smith, Shang

Stored Beam & Injection

1200-1600

RF conditioning with beam – 162 bunches try for more 120 mA. Decide on RF voltage

Emery

Stored Beam & Injection

1200-1600

Look for ion effects

Calvey

Stored Beam & Injection

1200-1600

Verify logging of PSD; check orbit stability

Borland

Stored Beam & Injection

1600-2000

Check super-slow 3-second kick-out using >5 nC bunches

Harkay

Stored Beam & Injection

1600-2000

Check trajectory PVs;

Measure Optics (< 11 mA)

Emery

Stored Beam & Injection

2000-2400

Finish any pem testing in injectors

Fystro

Limited Injection


Tuesday, September 10, 2024



0000-0300

Septum FF with trajectory data collection

Mohsen Emery

Stored Beam & Injection

0300-0800

Debug non-linear optimization

Kuklev

Stored Beam & Injection

0800-1600

BLS quench detection

Berenc, Kelly, Horan

Stored Beam & Injection

1600-1800

SR Hands on training

Emery, COs

Stored Beam & Injection

1800-2100

LFB timing check

Brill, Kallakuri

Stored Beam & Injection

2100-2400

Correct Optics due to ATL, if necessary

Sajaev

Stored Beam & Injection


Wednesday, September 11, 2024



0000-0600

Open


Stored Beam & Injection

0600-0800

SR Hands on training

Emery, COs

Stored Beam & Injection

0800-1200

New IES firmware for target bunch tracking

Wang

Stored Beam & Injection

1200-1600

PAR kicker noise suppression

T. Smith

Stored Beam & No Injection

1200-1600

Validation of Swap-out software update

Borland

Stored Beam & No Injection

1600-2100

MOFB, strive for speed

Borland Arnold

Limited Injection

2100-2400

BPM dependency study

Weixing

Stored Beam & Injection


Thursday, September 12, 2024



0000-0300

BPM dependency study

Weixing

Stored Beam & Injection

0300-0800

Non-linear Optimization

Kuklev

Stored Beam & Injection

0800-1200

Open – reserved for possible access. Will be reconsidered on Wed.

OPS

No Stored Beam & No Injection

1200-1600

MOFB optimizations

Borland Emery

Stored Beam & Injection

1600-2400

BLS cavity conditioning

Berenc Wienands Kelly

Stored Beam & Injection


Friday, September 13, 2024



0000-0400

BPM single-pass dependency study, part I

Weixing

Stored Beam & Injection

0400-0800

Open


Stored Beam & Injection

0800-1200

ID BPLD Validation (Part II of MPS validations)

Bui, M. Smith, Shang

Stored Beam & Injection

1200-1400

Steering & MOFB training

Emery, COs, Calvey

Stored Beam & Injection

1400-2000

RG1 studies

Sun

Stored Beam & No Injection

2000-2400

Booster tuner operation modes

Calvey Berenc

Stored Beam & Limited Injection


Saturday, September 14, 2024



0000-0400

Tune Measurement with coupling

Kallakuri Emery

Stored Beam & Injection

0400-1200

Open


Stored Beam & Injection

1200-1400

PAR Diagnostics

Harkay

Stored Beam & Limited Injection

1400-2000

Booster ramp studies with MOFB

Calvey

Stored Beam & Injection

2000-2400

BPM single-pass dependency study, part II

Weixing

Stored Beam & Injection


Sunday, September 15, 2024



0000-0600

Open


Stored Beam & Injection

0600-1400

PAR beam loading

Harkay

Stored Beam & Injection

1400-1800

RF voltage FF

Borland Emery

Stored Beam & Injection

1800-2400

RG1 studies

Sun

Stored Beam & Injection


Monday, September 16, 2024



0000-0600

HOM measurements

Emery Kallakuri

Stored Beam & Injection

0600-0800

Prepare for User Beam Operations 100 mA – 162 bunches

OPS

Stored Beam & Injection