Machine Studies
Draft Schedule for Run02-6, 2025
July 14 0800 – July 15 0800
Time |
Descriptions |
Studiers |
SR Status |
|
Monday, July 14, 2025 |
|
|
0830-0900 |
Deploy DCCT ioc |
Grass |
No Beam |
0830-0900 |
Reboot beam quality ioc |
Smith |
No Beam |
0830-0900 |
Reboot sioc2iocinjorch1 |
Controls |
No Beam |
0830-1030 |
Repair water leak at S30 T1 |
Vargas |
No Beam |
0830-1030 |
Investigate 60Hz noise at S01AQ3 |
Kreps |
No Beam |
0830-1030 |
Investigate P1K thyratron sensor |
Puttkammer |
Limited Injection |
0830-1030 |
Troubleshoot L5:SC2:VL |
PS group |
No Injection |
0830-1030 |
Remove jumper from LACIS |
Nguyen |
Access ITS |
0830-1030 |
Upgrade SR Raw PLC code |
Ruan |
No Beam |
0830-1230 |
Spotknock RF-5 |
RF Group |
No Injection |
0830-1230 |
Contractor water work for RF2 SSA |
Swetin |
No Beam |
0900-1000 |
Inspect BLS cryostat |
Fuerst |
Acces Zone F |
0900-1000 |
Check labeling on SIO2 cables |
Weghorn |
Access Zone F |
0900-1000 |
Work on FLIR camera |
DIAG |
Access Zone F |
0900-1300 |
Fix taper on 8ID US |
Wei |
Access Zone A |
1300-1430 |
Recover SR systems |
Ops/FAC |
Limited injection |
|
|
|
|
1100-1400 |
PAR high charge study |
Mohsen |
Limited Injection |
1400-1600 |
Operator training (08-18), including SR |
Ops |
Limited injection |
1600-2100 |
Booster high charge studies |
Calvey Mohsen |
Limited Injection |
1600-1800 |
Test the PSDAQ and DAQ on waveform monitoring |
Paskvan |
No Beam |
1800-2100 |
Informal testing of K1-based swap-out permissive. Need power supplies. No injection. |
Borland |
No Beam |
2100-2300 |
Operator training (08-18) |
Ops |
Limited injection |
2300-0200 |
Repeat the LB+ crossbar switching test |
Cheng |
Stored beam & injection |
|
Tuesday July 15, 2025 |
|
|
0200-0400 |
SR aperture at septum |
Emery |
Stored beam & injection |
0400-0600 |
SR set up |
Emery |
Stored beam & injection |
0600-0800 |
Injector training/prepare for user beam |
Ops |
Stored beam & injection |