Machine Studies

Draft Schedule for Run01-14 2025

May 1 0000 – May 1 1159



Time

Descriptions

Studiers

SR Status


Thursday, May 1, 2025



0000

Refill to 130 mA with 216 bunches.

Emery

Stored Beam and Injection

0000-0300

PAR RF12 power limit increase

Smith, Mohsen

Stored Beam and Limited Injection

0300-0600

PAR LLRF switch over

RF group, Berenc

Stored Beam and Limited Injection

0600

Tune BLS for 200 mA.

Berenc

Stored Beam and Injection

0600-1200

SR 6.5 MeV RF voltage, ID gaps closed, 216 bunches, 200 mA

RF group,

Berenc, Borland

Stored Beam and Injection

1200-1400

Measure the minimum achievable gap for the individual ID (may overlap with above)

Li

Stored Beam and Injection

1400-1500

test the LB+ re-sync and reboot procedures (if there is time)

Berkland

Stored Beam and Injection

1500-1630

Routine response matrix (if there is time).

Sajaev

Stored Beam and Injection

1630-1700

Untune (park) the BLS cavity (need some moderate stored current)

Berenc

No beam

1700-2100

SR untuned (parked) BLS running at 4 K with 200 mA.

Fuerst, Kelly

Stored Beam and Injection

2100-2400

Tuning the BLS while running at 4 K with 200 mA.

Fuerst, Kelly, Berenc

Stored Beam and Injection