Machine Studies

Draft Schedule for Run03-7, 2024

November 18 0800 – November 19 0800



Time

Descriptions

Studiers

SR Status


Monday, November 18, 2024



0800-1000

Install BEFI power supply

Kisbaugh

No Beam and no linac beam

0800-0900

Reboot all xbpm iocs

S. Xu

No Beam and no linac beam

0800-1100

Test slow beam abort. Needs Zone F powered.

Paskvan

No Beam and no linac beam

0800-1000

Reboot iocinjtime, iocpar01 and ioclilaser

Hong

No Beam and no linac beam

0800-1200

Verify 8ID wiring

Boron

No Beam and no linac beam

0800-1200

RG2 kicker repairs

Puttkammer

No Beam and no linac beam

0900-1100

Unlock shutters and perform end to end test 4IB & 16BM 13BM end to end test

McNamara/SI/MOM

Zone A & B Authorized Access

1100-1230

Recover SR. Adjust tunes if needed.

Ops, Emery

Stored beam & Injection

1100-1300

Booster training

Sas-Pawlik

Limited Injection

1200-1500

Injector console testing

Fystro/Ramsey

Limited Injection

1230-1500

Septum leakage field with (parasitic) decaying beam, 100 mA, different fill pattern for lifetime?

Borland

Stored beam & Limited Injection

1500-1700

Tune RFNS operating current and possibly tweaking of the BLS, 100 mA

Tim Berenc, S. Kallakuri, L. Emery

Stored beam & injection

1500-1700

Test running the injection sequencer using different DCCT configuration (parasitic)

Fors, Grass

Stored beam & injection

1700-1800

software testing and optimization with badger in linac

Mohsen

Stored beam & Limited injection

1800-2000

tune up linac, raise k2 and reduce K4 power

Y. Sun

Stored beam & Limited injection

2000-0100

Booster High charge studies

Calvey, Harkay, Mohsen

Stored beam & Limited injection


Tuesday November 18, 2024



0100-0400

HOM drive response measurements for scanning synchrotron tune, 100 mA, lesser priority.

Kallakuri, Emery

Stored beam & injection

0400-0600

(18-06) Injector training

Ops

Limited Injection

0600-0800

Injector training/prepare for user beam

Ops

Stored beam & injection